Table 5-1b. Cost Estimate Summary - Total Life Cycle Costs (2002-2116)
|
Thermal Loading |
MTHM |
Areal Mass Loading (MTHM/acre) |
Total Cost |
| Base Case, VA-HTL |
70,000 |
85 |
$ 29.5 |
| Base Case - ITL |
70,000 |
60 |
$ 31.2 |
| Base Case - LTL |
70,000 |
25 |
$ 33.4 |
| Module 1 - HTL |
105,000 |
85 |
$ 42.8 |
| Module 1 - ITL |
105,000 |
60 |
$ 44.0 |
| Module 1 - LTL |
105,000 |
25 |
$ 48.4 |
| Module 2 - HTL |
105,000 |
85 |
$ 44.8 |
| Module 2 - ITL |
105,000 |
60 |
$ 46.0 |
| Module 2 - LTL |
105,000 |
25 |
$ 50.4 |