Return to the Main Document

Table 5-2a. Cost by Elements for 70,000 MTHM Case (in $Billions)a

70,000 MTHM

FY 1999 – FY 2116

HTL

ITL

LTL

MGR

$ 20.2

$ 21.9

$ 24.1

WAST

$ 4.6

$ 4.6

$ 4.6

NV Rail

$ 0.8

$ 0.8

$ 0.8

Program Integration

$ 2.3

$ 2.3

$ 2.3

Institutional

$ 2.8

$ 2.8

$ 2.8

Total

$ 30.7

$ 32.4

$ 34.6

FY 2002 – FY 2116

HTL

ITL

LTL

MGRb

$ 19.3

$ 21.0

$ 23.2

WAST

$ 4.6

$ 4.6

$ 4.6

NV Rail

$ 0.8

$ 0.8

$ 0.8

Program Integration

$ 2.1

$ 2.1

$ 2.1

Institutional

$ 2.8

$ 2.8

$ 2.8

Total

$ 29.5

$ 31.2

$ 33.4

Previous Table | Next Table