Table 5-2b. Cost by Elements for 105,000 MTHM Module 1 Case (in $Billions) a
|
105,000 MTHM, Module 1 |
|||
|
FY 1999 – FY 2116 |
HTL |
ITL |
LTL |
| MGR |
$ 29.2 |
$ 30.4 |
$ 34.8 |
| WAST |
$ 7.2 |
$ 7.2 |
$ 7.2 |
| NV Rail |
$ 0.8 |
$ 0.8 |
$ 0.8 |
| Program Integration |
$ 2.8 |
$ 2.8 |
$ 2.8 |
| Institutional |
$ 3.9 |
$ 3.9 |
$ 3.9 |
|
Total |
$ 44.0 |
$ 45.2 |
$ 49.6 |
|
FY 2002 – FY 2116 |
HTL |
ITL |
LTL |
| MGRb |
$ 28.3 |
$ 29.5 |
$ 33.9 |
| WAST |
$ 7.2 |
$ 7.2 |
$ 7.2 |
| NV Rail |
$ 0.8 |
$ 0.8 |
$ 0.8 |
| Program Integration |
$ 2.6 |
$ 2.6 |
$ 2.6 |
| Institutional |
$ 3.8 |
$ 3.8 |
$ 3.8 |
|
Total |
$ 42.8 |
$ 44.0 |
$ 48.4 |