Table 5-2c. Cost by Elements for 105,000 MTHM Module 2 Case (in $Billions)a
|
105,000 MTHM, Module 2 |
|||
|
FY 1999 – FY 2116 |
HTL |
ITL |
LTL |
| MGR |
$ 30.5 |
$ 31.7 |
$ 36.1 |
| WAST |
$ 8.0 |
$ 8.0 |
$ 8.0 |
| NV Rail |
$ 0.8 |
$ 0.8 |
$ 0.8 |
| Program Integration |
$ 2.8 |
$ 2.8 |
$ 2.8 |
| Institutional |
$ 3.9 |
$ 3.9 |
$ 3.9 |
|
Total |
$ 46.0 |
$ 47.2 |
$ 51.6 |
|
FY 2002 – FY 2116 |
HTL |
ITL |
LTL |
| MGRb |
$ 29.6 |
$ 30.8 |
$ 35.2 |
| WAST |
$ 8.0 |
$ 8.0 |
$ 8.0 |
| NV Rail |
$ 0.8 |
$ 0.8 |
$ 0.8 |
| Program Integration |
$ 2.6 |
$ 2.6 |
$ 2.6 |
| Institutional |
$ 3.8 |
$ 3.8 |
$ 3.8 |
|
Total |
$ 44.8 |
$ 46.0 |
$ 50.4 |
Previous Table | Next Table