Environmental Impact Statement
Cost Summary Report


B00000000-01717-5700-00029 REV 01


Front Matter

Title Page
Disclaimer
Signature Page
Revision History
Acronyms


TABLE OF CONTENTS

1. OBJECTIVE

2. SCOPE
  2.1 REPOSITORY ELEMENTS OF COST AND BASIS
    2.1.1 Elements of Cost
    2.1.2 Basis of Estimate
  2.2 NON-REPOSITORY ELEMENTS OF COST AND BASIS OF ESTIMATES
    2.2.1 Waste Acceptance, Storage, and Transportation
    2.2.2 Nevada Transportation
    2.2.3 Program Integration
    2.2.4 Institutional

3. MAJOR ASSUMPTIONS

4. ESTIMATING METHODOLOGIES

5. COST SUMMARY

6. QUALITY

7. REFERENCES


TABLES

5-1a. Cost Estimate Summary – Total Future Life Cycle Costs (1999-2116)
5-1b. Cost Estimate Summary – Total Future Life Cycle Costs (2002-2116)
5-2a. Cost by Element for 70,000 MTHM Case
5-2b. Cost by Element for 105,000 MTHM Module 1 Case
5-2c. Cost by Element for 105,000 MTHM Module 2 Case