You are here

Categorical Exclusion (CX) Determinations By Date

  • January 23, 2013

    Kersey West Switching Station Interconnection Kiowa Creek - Welc 115 Kilovolt Transmission Line
    CX(s) Applied: B4.1, B4.11
    Date: 01/23/2013
    Location(s): Colorado
    Offices(s): Western Area Power Administration-Rocky Mountain Region

  • January 23, 2013

    Blast and Paint West Hackberry, Texas 22 Header Piping
    CX(s) Applied: B1.3
    Date: 01/23/2013
    Location(s): Louisiana
    Offices(s): Strategic Petroleum Reserve Field Office

  • January 23, 2013

    Provision of Funds to Acquire a Conservation Easement Over the 310-acre Coyote Creek property.
    CX(s) Applied: B1.25
    Date: 01/23/2013
    Location(s): Oregon
    Offices(s): Bonneville Power Administration

  • January 22, 2013

    Induced Seismicity/Fluid Injection: Development of Strategies to Manage Fluid Disposal in Shale Plays
    CX(s) Applied: A9, A11
    Date: 01/22/2013
    Location(s): Texas
    Offices(s): National Energy Technology Laboratory

  • January 22, 2013

    MSA Annual Categorical Exclusion for Facilities for Storing Packaged Hazardous Waste for 90 Days or Less
    CX(s) Applied: B6.4
    Date: 01/22/2013
    Location(s): Washington
    Offices(s): River Protection-Richland Operations Office

  • January 22, 2013

    Removal of Glass Feed Prep System from 786-A (EDL)
    CX(s) Applied: B1.23
    Date: 01/22/2013
    Location(s): South Carolina
    Offices(s): Savannah River Operations Office

  • January 22, 2013

    Non-radioactive Simulant Testing of Impacts of the DWPF Alternative Reductant on the Tank Farm Evaporator
    CX(s) Applied: B3.6
    Date: 01/22/2013
    Location(s): South Carolina
    Offices(s): Savannah River Operations Office

  • January 18, 2013

    Development of Geographical Information System-Based Tool for Optimized Fluid Management in Shale Gas Operations
    CX(s) Applied: A9, A11, B3.6
    Date: 01/18/2013
    Location(s): Colorado
    Offices(s): National Energy Technology Laboratory

  • January 17, 2013

    Achieving Tier 4 Emissions and Efficiency in Biomass Cookstoves
    CX(s) Applied: A9, B3.6, B5.15
    Date: 01/17/2013
    Location(s): Colorado
    Offices(s): Golden Field Office

  • January 17, 2013

    Environmental Biotechnology General Laboratory Operations
    CX(s) Applied: B3.6
    Date: 01/17/2013
    Location(s): South Carolina
    Offices(s): Savannah River Operations Office

  • January 17, 2013

    Deactivation and Decommissioning of Soil Vapor Extraction Units
    CX(s) Applied: B1.23
    Date: 01/17/2013
    Location(s): South Carolina
    Offices(s): Savannah River Operations Office

  • January 17, 2013

    Power to H-1Y Laydown Yard
    CX(s) Applied: B2.1
    Date: 01/17/2013
    Location(s): South Carolina
    Offices(s): Savannah River Operations Office

  • January 17, 2013

    Flame Forming Proppants
    CX(s) Applied: B3.6
    Date: 01/17/2013
    Location(s): South Carolina
    Offices(s): Savannah River Operations Office

  • January 17, 2013

    Virginia Offshore Wind Technology Advancement Project
    CX(s) Applied: A9, B3.1, B3.16
    Date: 01/17/2013
    Location(s): Virginia
    Offices(s): Golden Field Office

  • January 17, 2013

    The University of Maine's "New England Aqua Ventus I" Program
    CX(s) Applied: A9, B3.6
    Date: 01/17/2013
    Location(s): Maine
    Offices(s): Golden Field Office

  • January 16, 2013

    Thermoelectric Generators for Direct Conversion of Vehicle Waste Heat in Useful Electric Power
    CX(s) Applied: B3.6
    Date: 01/16/2013
    Location(s): Washington
    Offices(s): National Energy Technology Laboratory

  • January 16, 2013

    Midwest Region Alternative Fuels Project
    CX(s) Applied: A1, B5.22
    Date: 01/16/2013
    Location(s): Kansas
    Offices(s): National Energy Technology Laboratory

  • January 16, 2013

    Western's Power Marketing Operations Center New Fiber Optic Cable Installation
    CX(s) Applied: B1.31, B2.2, B4.7
    Date: 01/16/2013
    Location(s): Colorado
    Offices(s): Western Area Power Administration-Rocky Mountain Region

  • January 16, 2013

    Lusk Rural Substation Control Building Construction
    CX(s) Applied: B1.3
    Date: 01/16/2013
    Location(s): Wyoming
    Offices(s): Western Area Power Administration-Rocky Mountain Region

  • January 15, 2013

    Deactivation and Decommissioning of Soil Vapor Extraction Units
    CX(s) Applied: B1.23
    Date: 01/15/2013
    Location(s): South Carolina
    Offices(s): Savannah River Operations Office

  • January 15, 2013

    Savannah River National Laboratory Electrolyzer 30 weight % Sulfuric Acid pH Adjustment
    CX(s) Applied: B3.6
    Date: 01/15/2013
    Location(s): South Carolina
    Offices(s): Savannah River Operations Office

  • January 15, 2013

    Separation of the Minor Actinides from the Lanthanides with Magnetic Fields
    CX(s) Applied: B3.6
    Date: 01/15/2013
    Location(s): South Carolina
    Offices(s): Savannah River Operations Office

  • January 15, 2013

    Innovations in Advanced Materials and Metals (IAM2)
    CX(s) Applied: A9, A11
    Date: 01/15/2013
    Location(s): Washington
    Offices(s): Golden Field Office

  • January 15, 2013

    Stabilization of Bio-Oil Fractions for Insertion into Petroleum Refineries
    CX(s) Applied: A9, B3.6
    Date: 01/15/2013
    Location(s): Iowa, Oklahoma, Washington
    Offices(s): Golden Field Office

  • January 15, 2013

    Optimized Co-Processing of Algal Bio-Crude through a Petroleum Refinery
    CX(s) Applied: A9, B3.6, B5.15
    Date: 01/15/2013
    Location(s): California, New Mexico
    Offices(s): Golden Field Office