Mission Support Alliance Annual Categorical Exclusion for Building and Equipment Instrumentation under 10 CFR 1021, Subpart D, Appendix B
CX(s) Applied: B2.2
Date: 12/05/2012
Location(s): Washington
Offices(s): River Protection-Richland Operations Office
-
December 5, 2012
-
December 5, 2012
Mission Support Alliance Annual Categorical Exclusion for Drop-Off, Collection, and Transfer Facilities for Recyclable Materials under 10 CFR 1021, Subpart D, Appendix B
CX(s) Applied: B1.35
Date: 12/05/2012
Location(s): Washington
Offices(s): River Protection-Richland Operations Office -
December 5, 2012
Advanced Test Reactor (ATR) Transition to Commercial Power
CX(s) Applied: B2.5
Date: 12/05/2012
Location(s): Idaho
Offices(s): Idaho Operations Office -
December 5, 2012
Demolition of Trailers 272, 280, 835, and 852
CX(s) Applied: B1.23
Date: 12/05/2012
Location(s): New York
Offices(s): Brookhaven Site Office -
December 4, 2012
In-situ X-ray Nanocharacterization of Defect Kinetics in Chalcogenide Solar Cell
CX(s) Applied: A9, B3.6
Date: 12/04/2012
Location(s): Arizona
Offices(s): Golden Field Office -
December 4, 2012
Alcoa Power Sales Contract
CX(s) Applied: B4.1
Date: 12/04/2012
Location(s): Oregon, Washington
Offices(s): Bonneville Power Administration -
December 4, 2012
Keeler Substation-Control House Expansion
CX(s) Applied: B4.11
Date: 12/04/2012
Location(s): Oregon
Offices(s): Bonneville Power Administration -
December 4, 2012
Supplemental Immobilization of Simulated Hanford Low Activity Waste
CX(s) Applied: B3.6
Date: 12/04/2012
Location(s): South Carolina
Offices(s): Savannah River Operations Office -
December 4, 2012
Using Solid Particles as Heat Transfer Fluid for Use in Concentrating Solar Power (CSP) Plants
CX(s) Applied: A9
Date: 12/04/2012
Location(s): Colorado
Offices(s): Golden Field Office -
December 4, 2012
PMVI Bay Area Photovoltaic Consortium
CX(s) Applied: A9, B3.15, B3.6
Date: 12/04/2012
Location(s): California
Offices(s): Golden Field Office -
December 3, 2012
FY13 Environmental Drainage Upgrades at Bonneville Power Administration’s Clatsop, Garrison, Lexington, Mapleton, Ovando, Pearl, and Wren Substations
CX(s) Applied: B4.6
Date: 12/03/2012
Location(s): Oregon, Montana, Washington, Oregon, Oregon
Offices(s): Bonneville Power Administration -
December 3, 2012
Chicago Climate Action Plan Advanced Transportation Technologies Initiative
CX(s) Applied: B5.1, B5.23
Date: 12/03/2012
Location(s): Illinois
Offices(s): Golden Field Office -
December 3, 2012
Construct New Transmission Line and Footings, Garrison Switchyard
CX(s) Applied: B4.13
Date: 12/03/2012
Location(s): North Dakota
Offices(s): Western Area Power Administration-Upper Great Plains Region -
November 30, 2012
Foreign Location Source Recovery - Fiscal Year 2013
CX(s) Applied: B2.6
Date: 11/30/2012
Location(s): New Mexico
Offices(s): Los Alamos Site Office -
November 30, 2012
Foreign Location Source Recovery - Fiscal Year 2013
CX(s) Applied: B2.6
Date: 11/30/2012
Location(s): New Mexico
Offices(s): Los Alamos Site Office -
November 29, 2012
772-F Low-Activity Drain (LAD) Discharge Header Modification
CX(s) Applied: B1.3
Date: 11/29/2012
Location(s): South Carolina
Offices(s): Savannah River Operations Office -
November 29, 2012
Chevron U.S.A. Inc.
CX(s) Applied: B5.7
Date: 11/29/2012
Location(s): Louisiana, California
Offices(s): Fossil Energy -
November 29, 2012
Dismantle and Remove (D&R) and Replace 773-A D-Wing Air Handling and Condensing Units
CX(s) Applied: B1.3
Date: 05/17/2012
Location(s): South Carolina
Offices(s): Savannah River Operations Office -
November 29, 2012
Spring Creek – Wine County No. 1 Transmission Tower Relocation
CX(s) Applied: B4.6
Date: 11/29/2012
Location(s): Oregon
Offices(s): Bonneville Power Administration -
November 29, 2012
Wood Pole Replacements Along the Drummond-Macks Inn, Macks Inn-Madison, and Swan Valley-Teton 115-kilovolt Transmission Line Rights-of-Way
CX(s) Applied: B1.3
Date: 11/29/2012
Location(s): Idaho, Idaho
Offices(s): Bonneville Power Administration -
November 29, 2012
Upgrade to the Concrete Masonry Unit (CMU) Wall at Test Reactor Area (TRA)-670
CX(s) Applied: B2.5
Date: 11/29/2012
Location(s): Idaho
Offices(s): Idaho Operations Office -
November 29, 2012
Refurbish 607-53C Sanitary Sewer Lift Station
CX(s) Applied: B1.3
Date: 11/29/2012
Location(s): South Carolina
Offices(s): Savannah River Operations Office -
November 28, 2012
Central Vermont Recovered Biomass Facility
CX(s) Applied: B5.20
Date: 11/28/2012
Location(s): Vermont
Offices(s): Golden Field Office -
November 28, 2012
Recovery Act: Advanced Seismic Data Analysis Program ('Hot Pot Project')
CX(s) Applied: A9, B3.1
Date: 11/28/2012
Location(s): CX: none
Offices(s): Golden Field Office -
November 28, 2012
Sopogy Subcontract
CX(s) Applied: A9, B5.15
Date: 11/28/2012
Location(s): Hawaii
Offices(s): Golden Field Office