Abandon-In-Place Four Cell Extensions Located at Seven Spings Laydown Yard
CX(s) Applied: B1.23
Date: 03/27/2013
Location(s): South Carolina
Offices(s): Savannah River Operations Office
Existing Regulations
B1.23: Demolition and disposal of buildings
Demolition and subsequent disposal of buildings, equipment, and support structures (including, but not limited to, smoke stacks and parking lot surfaces), provided that there would be no potential for release of substances at a level, or in a form, that could pose a threat to public health or the environment.
Previous Regulations
Categorical Exclusion Determinations dated before November 14th, 2011 were issued under previous DOE NEPA regulations. See the Notice of Final Rulemaking (76 FR 63763, 10/13/2011) for information changes to this categorical exclusion.
DOCUMENTS AVAILABLE FOR DOWNLOAD
-
March 27, 2013
-
January 22, 2013
Removal of Glass Feed Prep System from 786-A (EDL)
CX(s) Applied: B1.23
Date: 01/22/2013
Location(s): South Carolina
Offices(s): Savannah River Operations Office -
January 17, 2013
Deactivation and Decommissioning of Soil Vapor Extraction Units
CX(s) Applied: B1.23
Date: 01/17/2013
Location(s): South Carolina
Offices(s): Savannah River Operations Office -
January 15, 2013
Deactivation and Decommissioning of Soil Vapor Extraction Units
CX(s) Applied: B1.23
Date: 01/15/2013
Location(s): South Carolina
Offices(s): Savannah River Operations Office -
January 9, 2013
C-CA-CAM Building Complex Demolition and Site Restoration
CX(s) Applied: B1.11, B1.16, B1.17, B1.23, B1.24, B1.27, B1.30, B1.33, B1.34
Date: 01/09/2013
Location(s): Pennsylvania
Offices(s): Naval Nuclear Propulsion Program -
December 14, 2012
Washington River Protection Solutions LLC - Demolition and Disposal of Buildings
CX(s) Applied: B1.23
Date: 12/14/2012
Location(s): Washington
Offices(s): River Protection-Richland Operations Office -
December 5, 2012
Demolition of Trailers 272, 280, 835, and 852
CX(s) Applied: B1.23
Date: 12/05/2012
Location(s): New York
Offices(s): Brookhaven Site Office -
October 24, 2012
Routine Operating and Administrative Activities (ROAA)
CX(s) Applied: A8, A9, A11, B1.3, B1.23, B1.31
Date: 10/24/2012
Location(s): Missouri
Offices(s): Kansas City Site Office -
October 17, 2012
Removal of Out-of-Service Steam Line Segment; D-Area to Ameresco Biomass Cogeneration Facility
CX(s) Applied: B1.23
Date: 10/17/2012
Location(s): South Carolina
Offices(s): Savannah River Operations Office -
September 24, 2012
B28 Demolition National Energy Technology Laboratory Morgantown
CX(s) Applied: B1.23
Date: 09/24/2012
Location(s): West Virginia
Offices(s): National Energy Technology Laboratory -
September 24, 2012
Remove Odor Control System Located at the Southeast Exterior Corner of National Energy Technology Laboratory Morgantown Building 17
CX(s) Applied: B1.23
Date: 09/24/2012
Location(s): West Virginia
Offices(s): National Energy Technology Laboratory -
September 21, 2012
Routine and Non-Routine Activities at the Grand Junction, Colorado, Office Site
CX(s) Applied: B1.3, B1.4, B1.7, B1.13, B1.15, B1.16, B1.23, B1.24, B1.28, B2.1, B2.2, B2.4, B2.5, B3.1, B5.16, B6.1
Date: 09/21/2012
Location(s): Grand Junction
Offices(s): Legacy Management -
September 17, 2012
Audio/Video Technology Refresh: PGH/MGN
CX(s) Applied: B1.15, B1.23, B2.2
Date: 09/17/2012
Location(s): West Virginia, Pennsylvania
Offices(s): National Energy Technology Laboratory -
September 17, 2012
Kansas-City-Olathe
CX(s) Applied: A9, A11, B1.23, B5.1, B5.23
Date: 09/17/2012
Location(s): Kansas
Offices(s): Energy Efficiency and Renewable Energy -
September 12, 2012
Design for High Performance Sustainable Building Modifications Based on E4 Report - PGH
CX(s) Applied: B1.15, B1.23, B2.2
Date: 09/12/2012
Location(s): Pennsylvania
Offices(s): National Energy Technology Laboratory -
September 12, 2012
Design for High Performance Sustainable Building Modifications Based on E4 Report - MGN
CX(s) Applied: B1.15, B1.23, B2.2
Date: 09/12/2012
Location(s): West Virginia
Offices(s): National Energy Technology Laboratory -
August 31, 2012
B-22A Renovation
CX(s) Applied: B1.4, B1.7, B1.15, B1.23, B2.1, B2.3, B2.5
Date: 08/31/2012
Location(s): West Virginia
Offices(s): National Energy Technology Laboratory -
August 30, 2012
B17 Roof Replacement & Painting
CX(s) Applied: B1.23, B2.1, B2.5
Date: 08/30/2012
Location(s): Oregon
Offices(s): National Energy Technology Laboratory -
August 28, 2012
Deactivation and Demolition of Oak Ridge National Laboratory Buildings 3546 and 3606 (CX-3703X)
CX(s) Applied: B1.23
Date: 08/28/2012
Location(s): Tennessee
Offices(s): Oak Ridge Office -
August 25, 2012
Remove/Demolish T-20, T-14, T-15, T-29
CX(s) Applied: B1.23
Date: 08/25/2012
Location(s): West Virginia
Offices(s): National Energy Technology Laboratory -
August 24, 2012
Building 28-33 External Electrical Upgrades
CX(s) Applied: B1.23, B2.5, B4.6, B4.13
Date: 08/24/2012
Location(s): Oregon
Offices(s): National Energy Technology Laboratory -
August 8, 2012
Pittsburgh Guard Shack Replacement
CX(s) Applied: B1.23, B1.24
Date: 08/08/2012
Location(s): Pennsylvania
Offices(s): National Energy Technology Laboratory -
July 26, 2012
Removal of Out-of-Service Railroad Segment
CX(s) Applied: B1.23
Date: 07/26/2012
Location(s): South Carolina
Offices(s): Savannah River Operations Office -
July 26, 2012
Removal of Out-of-Service Steam Line Segment
CX(s) Applied: B1.23
Date: 07/26/2012
Location(s): South Carolina
Offices(s): Savannah River Operations Office -
July 24, 2012
Deactivation and Decommissioning of the D-Area Detritiation Cells and Relocation of Associated Handi-Houses
CX(s) Applied: B1.23
Date: 07/24/2012
Location(s): South Carolina
Offices(s): Savannah River Operations Office