You are here

Categorical Exclusion Determinations: B1.3

Existing Regulations

B1.3: Routine maintenance
Routine maintenance activities and custodial services for buildings, structures, rights-of-way, infrastructures (including, but not limited to, pathways, roads, and railroads), vehicles and equipment, and localized vegetation and pest control, during which operations may be suspended and resumed, provided that the activities would be conducted in a manner in accordance with applicable requirements. Custodial services are activities to preserve facility appearance, working conditions, and sanitation (such as cleaning, window washing, lawn mowing, trash collection, painting, and snow removal). Routine maintenance activities, corrective (that is, repair), preventive, and predictive, are required to maintain and preserve buildings, structures, infrastructures, and equipment in a condition suitable for a facility to be used for its designated purpose. Such maintenance may occur as a result of severe weather (such as hurricanes, floods, and tornados), wildfires, and other such events. Routine maintenance may result in replacement to the extent that replacement is in-kind and is not a substantial upgrade or improvement. In-kind replacement includes installation of new components to replace outmoded components, provided that the replacement does not result in a significant change in the expected useful life, design capacity, or function of the facility. Routine maintenance does not include replacement of a major component that significantly extends the originally intended useful life of a facility (for example, it does not include the replacement of a reactor vessel near the end of its useful life). Routine maintenance activities include, but are not limited to: (a) Repair or replacement of facility equipment, such as lathes, mills, pumps, and presses; (b) Door and window repair or replacement; (c) Wall, ceiling, or floor repair or replacement; (d) Reroofing; (e) Plumbing, electrical utility, lighting, and telephone service repair or replacement; (f) Routine replacement of high-efficiency particulate air filters; (g) Inspection and/or treatment of currently installed utility poles; (h) Repair of road embankments; (i) Repair or replacement of fire protection sprinkler systems; (j) Road and parking area resurfacing, including construction of temporary access to facilitate resurfacing, and scraping and grading of unpaved surfaces; (k) Erosion control and soil stabilization measures (such as reseeding, gabions, grading, and revegetation); (l) Surveillance and maintenance of surplus facilities in accordance with DOE Order 435.1, “Radioactive Waste Management,” or its successor; (m) Repair and maintenance of transmission facilities, such as replacement of conductors of the same nominal voltage, poles, circuit breakers, transformers, capacitors, crossarms, insulators, and downed powerlines, in accordance, where appropriate, with 40 CFR part 761 (Polychlorinated Biphenyls Manufacturing, Processing, Distribution in Commerce, and Use Prohibitions) or its successor; (n) Routine testing and calibration of facility components, subsystems, or portable equipment (such as control valves, in-core monitoring devices, transformers, capacitors, monitoring wells, lysimeters, weather stations, and flumes); (o) Routine decontamination of the surfaces of equipment, rooms, hot cells, or other interior surfaces of buildings (by such activities as wiping with rags, using strippable latex, and minor vacuuming), and removal of contaminated intact equipment and other material (not including spent nuclear fuel or special nuclear material in nuclear reactors); and (p) Removal of debris.

Previous Regulations

Categorical Exclusion Determinations dated before November 14th, 2011 were issued under previous DOE NEPA regulations. See the Notice of Final Rulemaking (76 FR 63763, 10/13/2011) for information changes to this categorical exclusion.

DOCUMENTS AVAILABLE FOR DOWNLOAD

  • February 7, 2013

    High Contamination Area Cleanup Project (4596)
    CX(s) Applied: B1.3
    Date: 06/25/2012
    Location(s): Tennessee
    Offices(s): Y-12 Site Office

  • January 29, 2013

    L-Area River Water Valve V-022 Bypass and Piping
    CX(s) Applied: B1.3
    Date: 01/29/2013
    Location(s): South Carolina
    Offices(s): Savannah River Operations Office

  • January 28, 2013

    242-16H Evaporator Acid Cleaning Process
    CX(s) Applied: B1.3
    Date: 01/28/2013
    Location(s): South Carolina
    Offices(s): Savannah River Operations Office

  • January 23, 2013

    Blast and Paint West Hackberry, Texas 22 Header Piping
    CX(s) Applied: B1.3
    Date: 01/23/2013
    Location(s): Louisiana
    Offices(s): Strategic Petroleum Reserve Field Office

  • January 16, 2013

    Lusk Rural Substation Control Building Construction
    CX(s) Applied: B1.3
    Date: 01/16/2013
    Location(s): Wyoming
    Offices(s): Western Area Power Administration-Rocky Mountain Region

  • January 15, 2013

    Urban Transmission Line Danger Tree Management
    CX(s) Applied: B1.3
    Date: 01/15/2013
    Location(s): Colorado, Colorado, Colorado, Colorado, Wyoming
    Offices(s): Western Area Power Administration-Rocky Mountain Region

  • January 11, 2013

    Copper Mountain to Boysen 34.5 Kilovolt Transmission Line Structure Replacement
    CX(s) Applied: B1.3
    Date: 01/11/2013
    Location(s): Wyoming
    Offices(s): Western Area Power Administration-Rocky Mountain Region

  • January 8, 2013

    Building 4 Drain Line Replacement
    CX(s) Applied: B1.3, B1.15, B1.31
    Date: 01/08/2013
    Location(s): Oregon
    Offices(s): National Energy Technology Laboratory

  • January 7, 2013

    Video Inspection of Bryan Mound 36-inch Raw Water Pipeline
    CX(s) Applied: B1.3
    Date: 01/07/2013
    Location(s): Texas
    Offices(s): Strategic Petroleum Reserve Field Office

  • January 7, 2013

    Roosevelt Radio Station Emergency Generator Removal and Replacement
    CX(s) Applied: B1.3
    Date: 01/07/2013
    Location(s): Washington
    Offices(s): Bonneville Power Administration

  • January 3, 2013

    Maintenance and Wood Pole Replacement along the Gila Wellton Mohawk 161 Kilovolt Transmission Line
    CX(s) Applied: B1.3
    Date: 01/03/2013
    Location(s): Arizona
    Offices(s): Western Area Power Administration-Desert Southwest Region

  • December 20, 2012

    WVDP-2012-02 Routine Maintenance
    CX(s) Applied: B1.3
    Date: 12/20/2012
    Location(s): New York
    Offices(s): West Valley Demonstration Project

  • December 19, 2012

    723-A Distribution Panel 4 (DB4) Replacement
    CX(s) Applied: B1.3
    Date: 12/19/2012
    Location(s): South Carolina
    Offices(s): Savannah River Operations Office

  • December 19, 2012

    Demonstrate Use of Various Distributed Energy Resources to Reduce Peak Load on Selected Feeders
    CX(s) Applied: A1, B1.3, B1.7, B1.31, B2.2, B4.4, B4.13, B5.1, B4.8
    Date: 12/19/2012
    Location(s): Colorado
    Offices(s): National Energy Technology Laboratory

  • December 19, 2012

    Improve the Access Road System in Miles 4, 5, 16, 17, 18, and 30 of the Lower Granite-Hatwai Transmission Line
    CX(s) Applied: B1.3, B1.13
    Date: 12/19/2012
    Location(s): Washington, Idaho
    Offices(s): Bonneville Power Administration

  • December 18, 2012

    Repair and Line Bryan Mound Brine Tank, BMT-1
    CX(s) Applied: B1.3
    Date: 12/18/2012
    Location(s): Texas
    Offices(s): Strategic Petroleum Reserve Field Office

  • December 14, 2012

    Washington River Protection Solutions LLC - Routine Maintenance
    CX(s) Applied: B1.3
    Date: 12/14/2012
    Location(s): Washington
    Offices(s): River Protection-Richland Operations Office

  • December 11, 2012

    Replace Brine Disposal System Header to Bryan Mound Brine Tank, GFE
    CX(s) Applied: B1.3
    Date: 12/11/2012
    Location(s): Texas
    Offices(s): Strategic Petroleum Reserve Field Office

  • December 11, 2012

    Loss of a Major Transformer at Bryan Mound or West Hackberry
    CX(s) Applied: B1.3
    Date: 12/11/2012
    Location(s): Texas, Louisiana
    Offices(s): Strategic Petroleum Reserve Field Office

  • December 10, 2012

    Replace Glovebox LAB-GB-50
    CX(s) Applied: B1.3
    Date: 12/10/2012
    Location(s): South Carolina
    Offices(s): Savannah River Operations Office

  • December 10, 2012

    723-A Distribution Panel 2 (DP2) Replacement
    CX(s) Applied: B1.3
    Date: 12/10/2012
    Location(s): South Carolina
    Offices(s): Savannah River Operations Office

  • December 7, 2012

    704-56H Sanitary Sewer Upgrade
    CX(s) Applied: B1.3
    Date: 12/07/2012
    Location(s): South Carolina
    Offices(s): Savannah River Operations Office

  • December 7, 2012

    716-N Yard Sinkhole Repair
    CX(s) Applied: B1.3
    Date: 12/07/2012
    Location(s): South Carolina
    Offices(s): Savannah River Operations Office

  • December 6, 2012

    Shipping Containers 9975, 9977, and 9978 Annual Maintenance and Testing
    CX(s) Applied: B1.3
    Date: 12/06/2012
    Location(s): South Carolina
    Offices(s): Savannah River Operations Office

  • December 5, 2012

    Mission Support Alliance Annual Categorical Exclusion for Routine Maintenance and Custodial Services under 10 CFR 1021, Subpart D, Appendix B
    CX(s) Applied: B1.3
    Date: 12/05/2012
    Location(s): Washington
    Offices(s): River Protection-Richland Operations Office