Coulee-Westside Transfer Trip Replacement
CX(s) Applied: B1.7
Date: 02/06/2013
Location(s): Washington, Washington
Offices(s): Bonneville Power Administration
Existing Regulations
B1.7: Electronic equipment
Acquisition, installation, operation, modification, and removal of electricity transmission control and monitoring devices for grid demand and response, communication systems, data processing equipment, and similar electronic equipment.
Previous Regulations
Categorical Exclusion Determinations dated before November 14th, 2011 were issued under previous DOE NEPA regulations. See the Notice of Final Rulemaking (76 FR 63763, 10/13/2011) for information changes to this categorical exclusion.
DOCUMENTS AVAILABLE FOR DOWNLOAD
-
February 6, 2013
-
January 29, 2013
Eugene Substation Protective Relay Installation
CX(s) Applied: B1.7
Date: 01/29/2013
Location(s): Oregon
Offices(s): Bonneville Power Administration -
January 7, 2013
Beck Road Substation Meter Installation
CX(s) Applied: B1.7
Date: 01/07/2013
Location(s): Idaho
Offices(s): Bonneville Power Administration -
December 31, 2012
Bertelsen Substation Metering Panel Segment Addition
CX(s) Applied: B1.7
Date: 12/31/2012
Location(s): Oregon
Offices(s): Bonneville Power Administration -
December 19, 2012
Demonstrate Use of Various Distributed Energy Resources to Reduce Peak Load on Selected Feeders
CX(s) Applied: A1, B1.3, B1.7, B1.31, B2.2, B4.4, B4.13, B5.1, B4.8
Date: 12/19/2012
Location(s): Colorado
Offices(s): National Energy Technology Laboratory -
December 5, 2012
Mission Support Alliance Annual Categorical Exclusion for Electronic Equipment under 10 CFR 1021, Subpart D, Appendix B
CX(s) Applied: B1.7
Date: 12/05/2012
Location(s): Washington
Offices(s): River Protection-Richland Operations Office -
November 27, 2012
Communication Line Installation Between Manhole F-39 and Building 221-12F
CX(s) Applied: B1.7
Date: 11/27/2012
Location(s): South Carolina
Offices(s): Savannah River Operations Office -
November 19, 2012
Communications, Computing, and Data Processing Activities
CX(s) Applied: B1.7, B4.7
Date: 11/19/2012
Location(s): Tennessee, California, California, Virginia
Offices(s): Oak Ridge Office -
October 31, 2012
Power Monitoring, Communication and Control Upgrade at Bryan Mound Degas Plant (Install)
CX(s) Applied: B1.7
Date: 10/31/2012
Location(s): Texas
Offices(s): Strategic Petroleum Reserve Field Office -
October 19, 2012
Malin Substation Relay Equipment Replacements
CX(s) Applied: B1.7
Date: 10/19/2012
Location(s): Oregon
Offices(s): Bonneville Power Administration -
October 2, 2012
ADAS System Life Cycle Support, 2012-2015
CX(s) Applied: B1.7
Date: 10/02/2012
Location(s): CX: none
Offices(s): Strategic Petroleum Reserve Field Office -
September 21, 2012
Routine and Non-Routine Activities at the Grand Junction, Colorado, Office Site
CX(s) Applied: B1.3, B1.4, B1.7, B1.13, B1.15, B1.16, B1.23, B1.24, B1.28, B2.1, B2.2, B2.4, B2.5, B3.1, B5.16, B6.1
Date: 09/21/2012
Location(s): Grand Junction
Offices(s): Legacy Management -
September 13, 2012
Security Camera Installation
CX(s) Applied: A11, B1.7, B1.15, B2.2, B2.3
Date: 09/13/2012
Location(s): Pennsylvania
Offices(s): National Energy Technology Laboratory -
September 13, 2012
Morgantown Parking Garage Fire Alarm System
CX(s) Applied: B1.3, B1.7, B1.15, B2.5
Date: 09/13/2012
Location(s): West Virginia
Offices(s): National Energy Technology Laboratory -
August 31, 2012
B-22A Renovation
CX(s) Applied: B1.4, B1.7, B1.15, B1.23, B2.1, B2.3, B2.5
Date: 08/31/2012
Location(s): West Virginia
Offices(s): National Energy Technology Laboratory -
August 30, 2012
Albany PBX Upgrade
CX(s) Applied: B1.7
Date: 08/30/2012
Location(s): Oregon
Offices(s): National Energy Technology Laboratory -
August 28, 2012
Building 33 Conference Room Upgrades
CX(s) Applied: B1.7
Date: 08/28/2012
Location(s): Oregon
Offices(s): National Energy Technology Laboratory -
August 23, 2012
Pull/Install New Fiber Optic Cables From 241-2H to 241-62F (General)
CX(s) Applied: B1.7
Date: 08/23/2012
Location(s): South Carolina
Offices(s): Savannah River Operations Office -
August 8, 2012
Morgantown Parking Garage Fire Alarm System
CX(s) Applied: B1.3, B1.7, B2.5
Date: 08/08/2012
Location(s): West Virginia
Offices(s): National Energy Technology Laboratory -
July 27, 2012
Four AT&T Wireless Communication Site Upgrades
CX(s) Applied: B1.7, B1.19
Date: 07/27/2012
Location(s): Washington, Washington, Washington, Washington
Offices(s): Bonneville Power Administration -
July 23, 2012
Replacing Traditional Electric Meters with Smart Electric Meters - City of Newark, Delaware
CX(s) Applied: B1.7
Date: 07/23/2012
Location(s): Delaware
Offices(s): Golden Field Office -
June 25, 2012
Mason Substation Metering Replacement Project
CX(s) Applied: B1.7
Date: 06/25/2012
Location(s): Washington
Offices(s): Bonneville Power Administration -
May 31, 2012
Infrastructure Demolition, Replacement, and Related Activities at the Weldon Spring, Missouri, Site
CX(s) Applied: B1.3, B1.7, B1.15, B1.23, B1.24, B1.26, B1.36, B3.1, B4.7
Date: 05/31/2012
Location(s): Missouri
Offices(s): Legacy Management -
May 21, 2012
Bonneville Power Administration (BPA) Tacoma Power Chehalis- Covington 230-Kilovolt (kV) Line/Convert Microwave Signals From Analog To Digital
CX(s) Applied: B1.7
Date: 05/21/2012
Location(s): Washington, Washington, Washington
Offices(s): Bonneville Power Administration -
March 20, 2012
Integration of the Echo Point Community Wind Generation Project
CX(s) Applied: B1.7
Date: 03/20/2012
Location(s): Oregon
Offices(s): Bonneville Power Administration