Installation of a Ballymore Ladder at Sampling Location 4MC-002F
CX(s) Applied: B2.3
Date: 12/19/2012
Location(s): South Carolina
Offices(s): Savannah River Operations Office
Existing Regulations
B2.3: Personnel safety and health equipment
Installation of, or improvements to, equipment for personnel safety and health (including, but not limited to, eye washes, safety showers, radiation monitoring devices, fumehoods, and associated collection and exhaust systems), provided that the covered actions would not have the potential to cause a significant increase in emissions.
Previous Regulations
Categorical Exclusion Determinations dated before November 14th, 2011 were issued under previous DOE NEPA regulations. See the Notice of Final Rulemaking (76 FR 63763, 10/13/2011) for information changes to this categorical exclusion.
DOCUMENTS AVAILABLE FOR DOWNLOAD
-
December 19, 2012
-
November 19, 2012
Maintenance Activities
CX(s) Applied: B1.3, B1.27, B2.1, B2.2, B2.3, B5.1
Date: 11/19/2012
Location(s): Tennessee, California, California, Virginia
Offices(s): Oak Ridge Office -
November 19, 2012
Personnel Safety Enhancements
CX(s) Applied: B2.3, B2.5
Date: 11/19/2012
Location(s): Tennessee, California, California, Virginia
Offices(s): Oak Ridge Office -
November 19, 2012
Ventilation Activities
CX(s) Applied: B1.4, B1.16, B2.1, B2.3
Date: 11/19/2012
Location(s): Tennessee, California, California, Virginia
Offices(s): Oak Ridge Office -
September 21, 2012
Pittsburgh B84 Roof Fall Protection
CX(s) Applied: B2.1, B2.3
Date: 09/21/2012
Location(s): Pennsylvania
Offices(s): National Energy Technology Laboratory -
September 13, 2012
Security Camera Installation
CX(s) Applied: A11, B1.7, B1.15, B2.2, B2.3
Date: 09/13/2012
Location(s): Pennsylvania
Offices(s): National Energy Technology Laboratory -
September 7, 2012
Big 8 - 922, 920, 921 Heating, Ventilation and Air Conditioning Upgrades; 921, 74 Roof Replacement; HPSB Upgrades
CX(s) Applied: B2.1, B2.2, B2.3
Date: 09/07/2012
Location(s): Pennsylvania
Offices(s): National Energy Technology Laboratory -
August 31, 2012
B-22A Renovation
CX(s) Applied: B1.4, B1.7, B1.15, B1.23, B2.1, B2.3, B2.5
Date: 08/31/2012
Location(s): West Virginia
Offices(s): National Energy Technology Laboratory -
August 29, 2012
Pittsburgh B83 Boiler Room Ventilation/Cooling Project
CX(s) Applied: B2.1, B2.2, B2.3
Date: 08/29/2012
Location(s): Pennsylvania
Offices(s): National Energy Technology Laboratory -
August 1, 2012
Parking Garage Gutter Replacement and Installation of Roof Ice Melt System
CX(s) Applied: B2.3, B2.5
Date: 08/01/2012
Location(s): West Virginia
Offices(s): National Energy Technology Laboratory -
June 8, 2012
Renovations and Maintenance Activities for Buildings, Structures, Infrastructures and Equipment
CX(s) Applied: B1.3, 61.4, 61.5, B1.11, B1.15, B1.16, B1.17, 81.22, B1.27, 62.1, B2.2, B2.3, 62.5
Date: 06/08/2012
Location(s): Illinois
Offices(s): New Brunswick Laboratory -
February 9, 2012
Midwest Region Alternative Fuels Project
CX(s) Applied: B2.3, B5.1
Date: 02/09/2012
Location(s): Kansas
Offices(s): National Energy Technology Laboratory -
February 6, 2012
Add Blanks in Central Hood Exhaust (CHEX) System Ductwork Between FLT-17 and FLT-18
CX(s) Applied: B2.3
Date: 02/06/2012
Location(s): South Carolina
Offices(s): Savannah River Operations Office -
December 9, 2011
B94 Hazardous Gas Alarms
CX(s) Applied: B1.29, B2.1, B2.2, B2.3, B2.5
Date: 12/09/2011
Location(s): Pennsylvania
Offices(s): National Energy Technology Laboratory -
November 10, 2011
Add Time Delay to 772-1F Main Exhaust/Supply Air Interlock Circuit
CX(s) Applied: B2.3
Date: 11/10/2011
Location(s): South Carolina
Offices(s): Savannah River Operations Office -
October 25, 2011
Replace Degraded Chemical Hood Exhaust Duct in 735-A, D-wing Service Floor
CX(s) Applied: B2.3
Date: 10/25/2011
Location(s): South Carolina
Offices(s): Savannah River Operations Office -
September 13, 2011
Versailles Borough Stray Gas Mitigation - Continuation
CX(s) Applied: B2.3, B2.5, B6.1
Date: 09/13/2011
Location(s): Versailles, Pennsylvania
Office(s): Fossil Energy, National Energy Technology Laboratory -
September 1, 2011
Gore Substation Safety Lighting
CX(s) Applied: B2.3
Date: 09/01/2011
Location(s): Oklahoma
Offices(s): Southwestern Power Administration -
August 25, 2011
HAZGAS and Fire Alarm Monitoring System
CX(s) Applied: A11, B2.2, B2.3
Date: 08/25/2011
Location(s): Albany, Oregon
Office(s): Fossil Energy, National Energy Technology Laboratory -
August 24, 2011
Elverta Maintenance Facility Remodel
CX(s) Applied: B1.4, B1.15, B2.1, B2.3, B2.5
Date: 08/24/2011
Location(s): Sacramento County, California
Office(s): Western Area Power Administration-Sierra Nevada Region -
August 22, 2011
Building 40 New Video Surveillance
CX(s) Applied: A11, B1.15, B2.3
Date: 08/22/2011
Location(s): Morgantown, West Virginia
Office(s): Fossil Energy, National Energy Technology Laboratory -
August 3, 2011
Building 4 Mezzanine Renovation
CX(s) Applied: B1.3, B2.3
Date: 08/03/2011
Location(s): Morgantown, West Virginia
Office(s): Fossil Energy, National Energy Technology Laboratory -
June 14, 2011
Recovery Act: San Bernardino Associated Government Natural Gas Truck Project
CX(s) Applied: B2.2, B2.3, B5.1
Date: 06/14/2011
Location(s): Fontana, California
Office(s): Energy Efficiency and Renewable Energy, National Energy Technology Laboratory -
April 20, 2011
Add Blanks in Central Hood Exhaust (CHEX) System Ductwork Between FLT-53 and FLT-54
CX(s) Applied: B2.3
Date: 04/20/2011
Location(s): Aiken, South Carolina
Office(s): Environmental Management, Savannah River Operations Office -
April 5, 2011
Energy Efficiency Retrofits and Conservation Plan
CX(s) Applied: A1, A9, B2.3, B5.1
Date: 04/05/2011
Location(s): Penn Hills, Pennsylvania
Office(s): Energy Efficiency and Renewable Energy