You are here

Categorical Exclusion Determinations: B3.1

Existing Regulations

B3.1: Site characterization and environmental monitoring
Site characterization and environmental monitoring (including, but not limited to, siting, construction, modification, operation, and dismantlement and removal or otherwise proper closure (such as of a well) of characterization and monitoring devices, and siting, construction, and associated operation of a small-scale laboratory building or renovation of a room in an existing building for sample analysis). Such activities would be designed in conformance with applicable requirements and use best management practices to limit the potential effects of any resultant ground disturbance. Covered activities include, but are not limited to, site characterization and environmental monitoring under CERCLA and RCRA. (This class of actions excludes activities in aquatic environments. See B3.16 of this appendix for such activities.) Specific activities include, but are not limited to: (a) Geological, geophysical (such as gravity, magnetic, electrical, seismic, radar, and temperature gradient), geochemical, and engineering surveys and mapping, and the establishment of survey marks. Seismic techniques would not include large-scale reflection or refraction testing; (b) Installation and operation of field instruments (such as stream-gauging stations or flow-measuring devices, telemetry systems, geochemical monitoring tools, and geophysical exploration tools); (c) Drilling of wells for sampling or monitoring of groundwater or the vadose (unsaturated) zone, well logging, and installation of water-level recording devices in wells; (d) Aquifer and underground reservoir response testing; (e) Installation and operation of ambient air monitoring equipment; (f) Sampling and characterization of water, soil, rock, or contaminants (such as drilling using truck- or mobile-scale equipment, and modification, use, and plugging of boreholes); (g) Sampling and characterization of water effluents, air emissions, or solid waste streams; (h) Installation and operation of meteorological towers and associated activities (such as assessment of potential wind energy resources); (i) Sampling of flora or fauna; and (j) Archeological, historic, and cultural resource identification in compliance with 36 CFR part 800 and 43 CFR part 7.

Previous Regulations

Categorical Exclusion Determinations dated before November 14th, 2011 were issued under previous DOE NEPA regulations. See the Notice of Final Rulemaking (76 FR 63763, 10/13/2011) for information changes to this categorical exclusion.

DOCUMENTS AVAILABLE FOR DOWNLOAD

  • April 8, 2013

    Characterization, Investigation, and Environmental Monitoring Activities
    CX(s) Applied: B3.1
    Date: 11/19/2012
    Location(s): Tennessee, California, California, Virginia
    Offices(s): Oak Ridge Office

  • January 28, 2013

    F-08 Industrial Wastewater Outfall Flow Measurement Improvements
    CX(s) Applied: B3.1
    Date: 01/28/2013
    Location(s): South Carolina
    Offices(s): Savannah River Operations Office

  • January 17, 2013

    Virginia Offshore Wind Technology Advancement Project
    CX(s) Applied: A9, B3.1, B3.16
    Date: 01/17/2013
    Location(s): Virginia
    Offices(s): Golden Field Office

  • January 7, 2013

    Project Icebreaker
    CX(s) Applied: A9, B3.1
    Date: 01/07/2013
    Location(s): Ohio
    Offices(s): Golden Field Office

  • January 2, 2013

    Strategic Petroleum Reserve Site Subsidence Surveys, 2013-2017
    CX(s) Applied: B3.1
    Date: 01/02/2013
    Location(s): Louisiana, Texas, Texas, Louisiana
    Offices(s): Strategic Petroleum Reserve Field Office

  • December 17, 2012

    National Oceanic and Atmospheric Administration (NOAA) Birch Creek Canyon Wind Study
    CX(s) Applied: B3.1
    Date: 12/17/2012
    Location(s): Idaho
    Offices(s): Idaho Operations Office

  • December 14, 2012

    Washington River Protection Solutions LLC - Site Characterization and Environmental Monitoring
    CX(s) Applied: B3.1
    Date: 12/14/2012
    Location(s): Washington
    Offices(s): River Protection-Richland Operations Office

  • December 14, 2012

    CH2MHill Plateau Remediation Company - Site Characterization and Environmental Monitoring, December 2012 to December 2013
    CX(s) Applied: B3.1
    Date: 12/14/2012
    Location(s): Washington
    Offices(s): River Protection-Richland Operations Office

  • December 13, 2012

    Sologen Geothermal Co-Production Field Demonstration
    CX(s) Applied: A9, B1.31, B3.1, B4.12, B5.5, B5.12, B5.15
    Date: 12/13/2012
    Location(s): Texas
    Offices(s): Golden Field Office

  • December 12, 2012

    Assessment of Wind Resource on Tribal Land
    CX(s) Applied: A9, A11, B3.1
    Date: 12/12/2012
    Location(s): Oklahoma
    Offices(s): Golden Field Office

  • December 12, 2012

    Improving Atmospheric Models for Offshore Wind Resource Mapping and Prediction Using LIDAR, Aircraft and In-Ocean Observations
    CX(s) Applied: A9, B3.1, B3.2
    Date: 12/12/2012
    Location(s): New York
    Offices(s): Golden Field Office

  • December 12, 2012

    Southwest Regional Partnership on Carbon Sequestration: Phase III Commercial-Scale Geologic Carbon Capture, Utilization and Storage Department
    CX(s) Applied: B3.1
    Date: 12/12/2012
    Location(s): Texas
    Offices(s): National Energy Technology Laboratory

  • December 12, 2012

    Southwest Regional Partnership on Carbon Sequestration: Phase III Commercial-Scale Geologic Carbon Capture, Utilization and Storage Department
    CX(s) Applied: B3.1
    Date: 12/12/2012
    Location(s): Texas
    Offices(s): National Energy Technology Laboratory

  • December 5, 2012

    Mission Support Alliance Annual Categorical Exclusion for Site Characterization and Environmental Monitoring under 10 CFR 1021, Subpart D, Appendix B
    CX(s) Applied: B3.1
    Date: 12/05/2012
    Location(s): Washington
    Offices(s): River Protection-Richland Operations Office

  • November 28, 2012

    Recovery Act: Advanced Seismic Data Analysis Program ('Hot Pot Project')
    CX(s) Applied: A9, B3.1
    Date: 11/28/2012
    Location(s): CX: none
    Offices(s): Golden Field Office

  • November 19, 2012

    Analytical Services and Development Support Activities
    CX(s) Applied: B1.15, B3.1, B3.6, B3.10
    Date: 11/19/2012
    Location(s): Tennessee, California, California, Virginia
    Offices(s): Oak Ridge Office

  • November 7, 2012

    Defense Threat Reduction Agency (DTRA) Radar Testing
    CX(s) Applied: B3.1
    Date: 11/07/2012
    Location(s): South Carolina
    Offices(s): Savannah River Operations Office

  • November 1, 2012

    Development and Test of a 1,000 Level 3C Fiber Optic Borehole Seismic Receiver Array Applied to Carbon
    CX(s) Applied: A9, B3.1
    Date: 11/01/2012
    Location(s): Texas
    Offices(s): National Energy Technology Laboratory

  • November 1, 2012

    Development and Test of a 1,000 Level 3C Fiber Optic Borehole Seismic Receiver Array Applied to Carbon
    CX(s) Applied: A9, B3.1
    Date: 11/01/2012
    Location(s): California
    Offices(s): National Energy Technology Laboratory

  • October 31, 2012

    High Activity Waste Trailer (HAWT) Disposition
    CX(s) Applied: B3.1
    Date: 10/31/2012
    Location(s): South Carolina
    Offices(s): Savannah River Operations Office

  • October 15, 2012

    Aquatic Invasive Mussels Monitoring
    CX(s) Applied: B3.1
    Date: 10/15/2012
    Location(s): CX: none
    Offices(s): Bonneville Power Administration

  • September 28, 2012

    Midwest Regional Carbon Sequestration Partnership - Subtask 1.7
    CX(s) Applied: B3.1
    Date: 09/28/2012
    Location(s): Michigan
    Offices(s): National Energy Technology Laboratory

  • September 24, 2012

    CH2MHill Plateau Remediation Company - Site Characterization and Environmental Monitoring
    CX(s) Applied: B3.1
    Date: 09/24/2012
    Location(s): Washington
    Offices(s): River Protection-Richland Operations Office

  • September 21, 2012

    Routine and Non-Routine Activities at the Grand Junction, Colorado, Office Site
    CX(s) Applied: B1.3, B1.4, B1.7, B1.13, B1.15, B1.16, B1.23, B1.24, B1.28, B2.1, B2.2, B2.4, B2.5, B3.1, B5.16, B6.1
    Date: 09/21/2012
    Location(s): Grand Junction
    Offices(s): Legacy Management

  • September 11, 2012

    Basin-Scale Produced Water Management Tools and Options
    CX(s) Applied: A9, B3.1
    Date: 09/11/2012
    Location(s): Utah, Utah
    Offices(s): National Energy Technology Laboratory