Hydroelectric Power Rate Increase for the Robert Douglas Willis Hydropower Project
CX(s) Applied: B4.3
Date: 07/30/2012
Location(s): Texas, Texas, Texas
Offices(s): Southwestern Power Administration
Existing Regulations
B4.3: Electric power marketing rate changes
Rate changes for electric power, power transmission, and other products or services provided by a Power Marketing Administration that are based on a change in revenue requirements if the operations of generation projects would remain within normal operating limits.
DOCUMENTS AVAILABLE FOR DOWNLOAD
-
July 30, 2012
-
October 20, 2011
Hydroelectric Power Rate Increase for the Integrated System of Hydropower Projects
CX(s) Applied: B4.3
Date: 10/20/2011
Location(s): CX: none
Offices(s): Southwestern Power Administration -
December 15, 2010
Renewal of Rates and Services for the Central Valley Project, the California-Oregon Transmission Project, the Pacific Alternating Current Intertie, and Path 15 Transmission - Rate Order Number Western Area Power Administration-156
CX(s) Applied: B4.3
Date: 12/15/2010
Location(s): California
Office(s): Western Area Power Administration-Sierra Nevada Region -
October 26, 2009
Power Rate Formula for the Provo River Project of the Western Area Power Administration
CX(s) Applied: B4.3
Date: 10/26/2009
Location(s): Colorado
Office(s): Western Area Power Administration-Colorado River Storage Project Management Center -
August 3, 2009
Proposed rate adjustment for the Jim Woodruff System
CX(s) Applied: B4.3
Date: 08/03/2009
Location(s): Panhandle, Florida
Office(s): Southeastern Power Administration