Tualatin Valley Water District Waterline Land Use Review Request
CX(s) Applied: B4.9
Date: 12/31/2012
Location(s): Oregon
Offices(s): Bonneville Power Administration
Existing Regulations
B4.9: Multiple use of powerline rights-of-way
Granting or denying requests for multiple uses of a transmission facility’s rights-of-way (including, but not limited to, grazing permits and crossing agreements for electric lines, water lines, natural gas pipelines, communications cables, roads, and drainage culverts).
Previous Regulations
Categorical Exclusion Determinations dated before November 14th, 2011 were issued under previous DOE NEPA regulations. See the Notice of Final Rulemaking (76 FR 63763, 10/13/2011) for information changes to this categorical exclusion.
DOCUMENTS AVAILABLE FOR DOWNLOAD
-
December 31, 2012
-
December 27, 2012
Williams Northwest Pipeline Land Use Review Request
CX(s) Applied: B4.9
Date: 12/27/2012
Location(s): Washington
Offices(s): Bonneville Power Administration -
November 8, 2012
Tualatin River Pipeline Crossing Site- Monitoring Well Redevelopment
CX(s) Applied: B4.9
Date: 11/08/2012
Location(s): Oregon, Oregon
Offices(s): Bonneville Power Administration -
September 28, 2012
Curecanti-Rifle 230 Kilovolt Transmission Line Sullivan Ranch Irrigation Water Pipeline Project Between Structures 25/5 to 26/1
CX(s) Applied: B4.9
Date: 09/28/2012
Location(s): Colorado
Offices(s): Western Area Power Administration-Rocky Mountain Region -
July 23, 2012
License Outgrant to Owl Creek Water District Town of Thermopolis, Hot Springs County, Wyoming
CX(s) Applied: B4.9
Date: 07/23/2012
Location(s): Wyoming
Offices(s): Western Area Power Administration-Rocky Mountain Region -
May 15, 2012
City of Longview Pump Stations and Force Main Project
CX(s) Applied: B4.9
Date: 05/15/2012
Location(s): Washington
Offices(s): Bonneville Power Administration -
March 28, 2012
Portland General Electric 13-Kilovolt Overhead Electrical Line Land Use Review Request
CX(s) Applied: B4.9
Date: 03/28/2012
Location(s): Oregon
Offices(s): Bonneville Power Administration -
March 20, 2012
Snohomish High School Field Improvements
CX(s) Applied: B4.9
Date: 03/20/2012
Location(s): Washington
Offices(s): Bonneville Power Administration -
February 14, 2012
Clark County Harding Farms Land Use Review Request
CX(s) Applied: B4.9
Date: 02/14/2012
Location(s): Washington
Offices(s): Bonneville Power Administration -
February 6, 2012
Grant Consumer Power, Incorporated's Request for use of Right-of-way at Harrisburg Substation
CX(s) Applied: B4.9
Date: 02/06/2012
Location(s): Oregon
Offices(s): Bonneville Power Administration -
December 21, 2011
Highlands Trail in the Longview-Cowlitz Number 1 Transmission Line Right-of-Way
CX(s) Applied: B4.9
Date: 12/21/2011
Location(s): Washington
Offices(s): Bonneville Power Administration -
December 1, 2011
Grant New Cingular Wireless’ request for use of right-of-way at the Salem Substation
CX(s) Applied: B4.9
Date: 12/01/2011
Location(s): Oregon
Offices(s): Bonneville Power Administration -
September 19, 2011
Grant New Cingular Wireless? Request for Use of Right-Of-Way at the Salem Substation
CX(s) Applied: B4.9
Date: 09/19/2011
Location(s): Salem, Polk County, Oregon
Office(s): Bonneville Power Administration -
August 25, 2011
Tualatin Hills Park and Recreation District Request for Use of Right-Of-Way for Westside Trail
CX(s) Applied: B4.9
Date: 08/25/2011
Location(s): Beaverton, Oregon
Office(s): Bonneville Power Administration -
July 21, 2011
Murray Hill Recreation Association Permission to Cross Keeler-Oregon City Transmission Line
CX(s) Applied: B4.9
Date: 07/21/2011
Location(s): Washington County, Oregon
Office(s): Bonneville Power Administration -
April 15, 2011
Portland General Electric Overhead Line Crossing of Keeler-Oregon City
CX(s) Applied: B4.9
Date: 04/15/2011
Location(s): Willamette Meridian, Oregon
Office(s): Bonneville Power Administration -
October 13, 2010
Northwest Natural Devine Road Land Use Review Request
CX(s) Applied: B4.9
Date: 10/13/2010
Location(s): Clark County, Washington
Office(s): Bonneville Power Administration -
September 16, 2010
Mining Equipment Transmission Line Crossing
CX(s) Applied: B4.9
Date: 09/16/2010
Location(s): Haskell County, Oklahoma
Office(s): Southwestern Power Administration -
February 16, 2010
Eastshore Trail Construction
CX(s) Applied: B4.9
Date: 02/16/2010
Location(s): Shasta County, California
Office(s): Western Area Power Administration-Sierra Nevada Region -
February 16, 2010
Eastshore Trail Construction
CX(s) Applied: B4.9
Date: 02/16/2010
Location(s): Shasta County, California
Office(s): Western Area Power Administration-Sierra Nevada Region