American Recovery and Reinvestment Act Energized Missouri Water Loan Project at City of Maryville
CX(s) Applied: B5.1, B5.2
Date: 12/13/2012
Location(s): Missouri
Offices(s): Golden Field Office
Existing Regulations
B5.2: Modifications to pumps and piping
Modifications to existing pump and piping configurations (including, but not limited to, manifolds, metering systems, and other instrumentation on such configurations conveying materials such as air, brine, carbon dioxide, geothermal system fluids, hydrogen gas, natural gas, nitrogen gas, oil, produced water, steam, and water). Covered modifications would not have the potential to cause significant changes to design process flow rates or permitted air emissions.
Previous Regulations
Categorical Exclusion Determinations dated before November 14th, 2011 were issued under previous DOE NEPA regulations. See the Notice of Final Rulemaking (76 FR 63763, 10/13/2011) for information changes to this categorical exclusion.
DOCUMENTS AVAILABLE FOR DOWNLOAD
-
December 13, 2012
-
November 26, 2012
Install Temperature Monitoring on Big Hill 36 inch Crude Oil Pipeline
CX(s) Applied: B5.2
Date: 11/26/2012
Location(s): Texas
Offices(s): Strategic Petroleum Reserve Field Office -
November 8, 2012
Brigham City Hydro Generation Project
CX(s) Applied: B1.8, B5.2
Date: 11/08/2012
Location(s): Utah
Offices(s): Golden Field Office -
November 5, 2012
Alternate Source of Firewater at Bryan Mound
CX(s) Applied: B5.2
Date: 11/05/2012
Location(s): Texas
Offices(s): Strategic Petroleum Reserve Field Office -
July 17, 2012
Buried Flow Line from 32-A-34 to 34-AX-34
CX(s) Applied: B2.5, B5.2, B5.4
Date: 07/17/2012
Location(s): Wyoming
Offices(s): RMOTC -
July 17, 2012
Buried Flow Line from 32-A-34 to 34-AX-34
CX(s) Applied: B2.5, B5.2, B5.4
Date: 07/17/2012
Location(s): Wyoming
Offices(s): RMOTC -
June 27, 2012
Buried Flow Line from T-2-34 to T-1-33
CX(s) Applied: B2.5, B5.2, B5.4
Date: 06/27/2012
Location(s): Wyoming
Offices(s): RMOTC -
June 27, 2012
Buried Flow Line from T-2-34 to T-1-33
CX(s) Applied: B2.5, B5.2, B5.4
Date: 06/27/2012
Location(s): Wyoming
Offices(s): RMOTC -
June 13, 2012
Utility Corridor Extension
CX(s) Applied: B4.7, B4.11, B5.2, B5.5
Date: 06/13/2012
Location(s): Pennsylvania
Offices(s): Naval Nuclear Propulsion Program, Bettis Site -
June 13, 2012
Black Hills State Heating and Cooling Plant
CX(s) Applied: B1.15, B1.23, B2.2, B5.1, B5.2, B5.4
Date: 06/13/2012
Location(s): South Dakota
Offices(s): National Energy Technology Laboratory -
June 4, 2012
Small Scale Field Test Demonstrating Carbon Dioxide Sequestration in the Arbuckle Saline Aquifer
CX(s) Applied: B1.15, B3.6, B5.2
Date: 06/04/2012
Location(s): Kansas
Offices(s): National Energy Technology Laboratory -
May 31, 2012
Small Scale Electrical Power Generation from Heat Co-produced in Geothermal Fluids
CX(s) Applied: A9, B3.6, B5.2, B5.15
Date: 05/31/2012
Location(s): Nevada
Offices(s): Golden Field Office -
May 31, 2012
Scale Resistant Heat Exchangers for Low Temperature Geothermal Binary Cycle Power Plant
CX(s) Applied: A9, B5.2, B5.15
Date: 05/31/2012
Location(s): California
Offices(s): Golden Field Office -
May 1, 2012
2009 National Biodiesel Foundation Biodiesel Infrastructure Project
CX(s) Applied: B5.2, B5.22
Date: 05/01/2012
Location(s): Iowa
Offices(s): National Energy Technology Laboratory -
February 13, 2012
Water and Sewer Energy Efficiency Grants Market Title
CX(s) Applied: A1, B1.4, B2.2, B5.1, B5.2
Date: 02/13/2012
Location(s): South Carolina
Offices(s): National Energy Technology Laboratory -
January 10, 2012
Henderson Family Young Mens Christian Association
CX(s) Applied: B5.1, B5.2
Date: 01/10/2012
Location(s): North Carolina
Offices(s): National Energy Technology Laboratory -
October 6, 2011
AAG Water Purification Project
CX(s) Applied: B1.26, B5.2
Date: 10/06/2011
Location(s): Wyoming
Offices(s): RMOTC -
June 7, 2011
Maintaining and Replacing Infrastructure
CX(s) Applied: B1.22, B5.2
Date: 06/07/2011
Location(s): Casper, Wyoming
Office(s): RMOTC -
April 7, 2011
Clean Energy Grant Program/Leon County Sustainable Demonstration Center
CX(s) Applied: A1, B1.4, B5.1, B5.2
Date: 04/07/2011
Location(s): Tallahassee, Florida
Office(s): Energy Efficiency and Renewable Energy, National Energy Technology Laboratory -
March 25, 2011
Clean Energy Grants - City of Marianna
CX(s) Applied: A1, B1.4, B5.1, B5.2
Date: 03/25/2011
Location(s): Marianna, Florida
Office(s): Energy Efficiency and Renewable Energy, National Energy Technology Laboratory -
February 28, 2011
Design and Implementation of Geothermal Energy Systems at West Chester University - 2
CX(s) Applied: A9, B5.1, B5.2
Date: 02/28/2011
Location(s): Pennsylvania
Office(s): Energy Efficiency and Renewable Energy, Golden Field Office -
February 28, 2011
Design and Implementation of Geothermal Energy Systems at West Chester University - 1
CX(s) Applied: A9, B5.1, B5.2
Date: 02/28/2011
Location(s): Pennsylvania
Office(s): Energy Efficiency and Renewable Energy, Golden Field Office -
January 13, 2011
Dig ditch from 24-51-STX-1 0 to 24-AX-10 and reinstall electrical wire
CX(s) Applied: B1.3, B5.2
Date: 01/13/2011
Location(s): Casper, Wyoming
Office(s): RMOTC -
January 3, 2011
T-2-33
CX(s) Applied: B1.22, B1.28, B1.30, B5.2, B6.1
Date: 01/03/2011
Location(s): Casper, Wyoming
Office(s): RMOTC -
January 3, 2011
T-1-27 Restoration
CX(s) Applied: B1.22, B1.23, B1.28, B1.30, B5.2, B6.1
Date: 01/03/2011
Location(s): Casper, Wyoming
Office(s): RMOTC