Categorical Exclusion Determinations: B5.23

Existing Regulations

B5.23: Electric vehicle charging stations
The installation, modification, operation, and removal of electric vehicle charging stations, using commercially available technology, within a previously disturbed or developed area. Covered actions are limited to areas where access and parking are in accordance with applicable requirements (such as local land use and zoning requirements) in the proposed project area and would incorporate appropriate control technologies and best management practices.

DOCUMENTS AVAILABLE FOR DOWNLOAD

  • December 3, 2012

    Chicago Climate Action Plan Advanced Transportation Technologies Initiative
    CX(s) Applied: B5.1, B5.23
    Date: 12/03/2012
    Location(s): Illinois
    Offices(s): Golden Field Office

  • October 18, 2012

    Recovery Act – Clean Energy Coalition Michigan Green Fleets
    CX(s) Applied: B5.23
    Date: 10/18/2012
    Location(s): Michigan
    Offices(s): National Energy Technology Laboratory

  • September 25, 2012

    High Efficiency, Low EMI and Positioning Tolerant Wireless Charging of Electric Vehicles
    CX(s) Applied: B3.6, B5.23
    Date: 09/25/2012
    Location(s): Michigan
    Offices(s): National Energy Technology Laboratory

  • September 25, 2012

    High Efficiency, Low EMI and Positioning Tolerant Wireless Charging of Electric Vehicles
    CX(s) Applied: B3.6, B5.23
    Date: 09/25/2012
    Location(s): California
    Offices(s): National Energy Technology Laboratory

  • September 17, 2012

    Kansas-City-Olathe
    CX(s) Applied: A9, A11, B1.23, B5.1, B5.23
    Date: 09/17/2012
    Location(s): Kansas
    Offices(s): Energy Efficiency and Renewable Energy

  • September 14, 2012

    Energy Audit; Efficiency Improvements; and Renewable Energy Installations; Township of Branchburg, NJ
    CX(s) Applied: B5.1, B5.16, B5.23
    Date: 09/14/2012
    Location(s): New Jersey
    Offices(s): Golden Field Office

  • September 7, 2012

    South Carolina-City-Columbia
    CX(s) Applied: A1, A9, B2.5, B5.1, B5.23
    Date: 09/07/2012
    Location(s): South Carolina
    Offices(s): Energy Efficiency and Renewable Energy

  • September 6, 2012

    Oregon-County-Lane
    CX(s) Applied: A9, A11, B2.5, B5.1, B5.23
    Date: 09/06/2012
    Location(s): Oregon
    Offices(s): Energy Efficiency and Renewable Energy

  • September 5, 2012

    Energy Efficiency and Conservation Block Grant Program
    CX(s) Applied: B5.23
    Date: 09/05/2012
    Location(s): Arizona
    Offices(s): Golden Field Office

  • August 31, 2012

    Electric Drive Vehicle Demonstration and Infrastructure Evaluation
    CX(s) Applied: B5.23
    Date: 08/31/2012
    Location(s): Pennsylvania
    Offices(s): National Energy Technology Laboratory

  • August 31, 2012

    Electric Drive Vehicle Demonstration and Infrastructure Evaluation
    CX(s) Applied: B5.23
    Date: 08/31/2012
    Location(s): Illinois
    Offices(s): National Energy Technology Laboratory

  • August 31, 2012

    Electric Drive Vehicle Demonstration and Infrastructure Evaluation
    CX(s) Applied: B5.23
    Date: 08/31/2012
    Location(s): Georgia
    Offices(s): National Energy Technology Laboratory

  • August 24, 2012

    Ohio Advanced Transportation Partnership - EVSE Installation in Walgreens Parking Lot
    CX(s) Applied: B5.23
    Date: 08/24/2012
    Location(s): Ohio
    Offices(s): National Energy Technology Laboratory

  • August 8, 2012

    Energy Efficiency and Conservation Block Grant Program- City of Winston-Salem, North Carolina
    CX(s) Applied: B5.23
    Date: 08/08/2012
    Location(s): North Carolina
    Offices(s): Golden Field Office

  • August 3, 2012

    Ohio Advanced Transportation Partnership - Installation of Electric Vehicle Charging in Walgreens Parking Lot
    CX(s) Applied: B5.23
    Date: 08/03/2012
    Location(s): Ohio
    Offices(s): National Energy Technology Laboratory

  • July 23, 2012

    Illinois Program Year 2012 State Energy Program Formula Award Application
    CX(s) Applied: A9, A11, B5.22, B5.23
    Date: 07/23/2012
    Location(s): Illinois
    Offices(s): Golden Field Office

  • July 19, 2012

    Energy Efficiency and Conservation Block Grant City of Honolulu, Hawaii
    CX(s) Applied: B5.23
    Date: 07/19/2012
    Location(s): Hawaii
    Offices(s): Golden Field Office

  • July 18, 2012

    Carolina Blue Skies Initiative
    CX(s) Applied: B5.23
    Date: 07/18/2012
    Location(s): North Carolina
    Offices(s): National Energy Technology Laboratory

  • July 16, 2012

    Ohio Advanced Transportation Partnership - Electrical Vehicle Supply Equipment Installation in Walgreens Parking Lot
    CX(s) Applied: B5.23
    Date: 07/16/2012
    Location(s): Ohio
    Offices(s): National Energy Technology Laboratory

  • July 11, 2012

    Ohio Advanced Transportation Partnership - Installation of Electric Vehicle Supply Equipment at The Ohio State University Campus
    CX(s) Applied: B5.23
    Date: 07/11/2012
    Location(s): Ohio
    Offices(s): National Energy Technology Laboratory

  • June 18, 2012

    Ohio Advanced Transportation Partnership - Installation of Level 2 Electrical Vehicle Supply Equipment
    CX(s) Applied: B5.23
    Date: 06/18/2012
    Location(s): Ohio
    Offices(s): National Energy Technology Laboratory

  • June 15, 2012

    Ohio Advanced Transportation Partnership - Electrical Vehicle Supply Equipment Installation in Walgreens Parking Lot
    CX(s) Applied: B5.23
    Date: 06/15/2012
    Location(s): Ohio
    Offices(s): National Energy Technology Laboratory

  • June 15, 2012

    Ohio Advanced Transportation Partnership - Installation of Level 2 Electrical Vehicle Supply Equipment
    CX(s) Applied: B5.23
    Date: 06/15/2012
    Location(s): Ohio
    Offices(s): National Energy Technology Laboratory

  • June 15, 2012

    Ohio Advanced Transportation Partnership - Installation of Level 2 Electrical Vehicle Supply Equipment
    CX(s) Applied: B5.23
    Date: 06/15/2012
    Location(s): Ohio
    Offices(s): National Energy Technology Laboratory

  • April 25, 2012

    Interstate Electrification Improvement
    CX(s) Applied: B5.1, B5.23
    Date: 04/25/2012
    Location(s): Ohio
    Offices(s): National Energy Technology Laboratory