Environmental Restoration and Waste Management Activities, Fiscal Year 2012-2013
CX(s) Applied: B6.1, B6.2
Date: 08/23/2011
Location(s): Amarillo, Texas
Office(s): NNSA-Headquarters, Pantex Site Office
Existing Regulations
B6.2: Waste collection, treatment, stabilization, and containment facilities
The siting, construction, and operation of temporary (generally less than 2 years) pilot-scale waste collection and treatment facilities, and pilot-scale (generally less than 1 acre) waste stabilization and containment facilities (including siting, construction, and operation of a small-scale laboratory building or renovation of a room in an existing building for sample analysis), provided that the action (1) supports remedial investigations/feasibility studies under CERCLA, or similar studies under RCRA (such as RCRA facility investigations/corrective measure studies) or other authorities and (2) would not unduly limit the choice of reasonable remedial alternatives (such as by permanently altering substantial site area or by committing large amounts of funds relative to the scope of the remedial alternatives).
Previous Regulations
Categorical Exclusion Determinations dated before November 14th, 2011 were issued under previous DOE NEPA regulations. See the Notice of Final Rulemaking (76 FR 63763, 10/13/2011) for information changes to this categorical exclusion.
DOCUMENTS AVAILABLE FOR DOWNLOAD
-
August 23, 2011
-
June 15, 2009
F Area Hazardous Waste Management Facility Silver Chloride Solution Injection Wells
CX(s) Applied: B6.2
Date: 06/15/2009
Location(s): Aiken, South Carolina
Office(s): Environmental Management, Savannah River Operations Office