Install Purge Water Management Unit(s) at Chemicals, Metals, and Pesticides Pits Monitoring Well(s)
CX(s) Applied: B6.9
Date: 12/13/2011
Location(s): South Carolina
Offices(s): Savannah River Operations Office
Existing Regulations
B6.9: Measures to reduce migration of contaminated groundwater
Small-scale temporary measures to reduce migration of contaminated groundwater, including the siting, construction, operation, and decommissioning of necessary facilities. These measures include, but are not limited to, pumping, treating, storing, and reinjecting water, by mobile units or facilities that are built and then removed at the end of the action.
DOCUMENTS AVAILABLE FOR DOWNLOAD
-
December 13, 2011
-
May 13, 2011
Silver Chloride Injection at the F Area Hazardous Waste Management Facilities Barrier Wall
CX(s) Applied: B6.9
Date: 05/13/2011
Location(s): Aiken, South Carolina
Office(s): Environmental Management, Savannah River Operations Office -
April 26, 2011
200 Area Tank Farm Interim Surface Barriers
CX(s) Applied: B6.9
Date: 04/26/2011
Location(s): Richland, Washington
Office(s): Environmental Management, Office of River Protection-Richland Office -
June 28, 2010
Installation and Operation of the North Plateau Full Scale Permeable Treatment Wall
CX(s) Applied: B1.6, B1.13, B6.1, B6.9
Date: 06/28/2010
Location(s): West Valley, New York
Office(s): West Valley Demonstration Project