You are here

Categorical Exclusion Determinations: Bonneville Power Administration

Categorical Exclusion Determinations issued by Bonneville Power Administration.

DOCUMENTS AVAILABLE FOR DOWNLOAD

  • February 6, 2013

    Coulee-Westside Transfer Trip Replacement
    CX(s) Applied: B1.7
    Date: 02/06/2013
    Location(s): Washington, Washington
    Offices(s): Bonneville Power Administration

  • January 29, 2013

    Eugene Substation Protective Relay Installation
    CX(s) Applied: B1.7
    Date: 01/29/2013
    Location(s): Oregon
    Offices(s): Bonneville Power Administration

  • January 23, 2013

    Provision of Funds to Acquire a Conservation Easement Over the 310-acre Coyote Creek property.
    CX(s) Applied: B1.25
    Date: 01/23/2013
    Location(s): Oregon
    Offices(s): Bonneville Power Administration

  • January 8, 2013

    Rogue-Gold Beach No. 2 Disconnect Switch Replacement
    CX(s) Applied: B4.6
    Date: 01/08/2013
    Location(s): Oregon
    Offices(s): Bonneville Power Administration

  • January 7, 2013

    Beck Road Substation Meter Installation
    CX(s) Applied: B1.7
    Date: 01/07/2013
    Location(s): Idaho
    Offices(s): Bonneville Power Administration

  • January 7, 2013

    Roosevelt Radio Station Emergency Generator Removal and Replacement
    CX(s) Applied: B1.3
    Date: 01/07/2013
    Location(s): Washington
    Offices(s): Bonneville Power Administration

  • December 31, 2012

    Bertelsen Substation Metering Panel Segment Addition
    CX(s) Applied: B1.7
    Date: 12/31/2012
    Location(s): Oregon
    Offices(s): Bonneville Power Administration

  • December 31, 2012

    Tualatin Valley Water District Waterline Land Use Review Request
    CX(s) Applied: B4.9
    Date: 12/31/2012
    Location(s): Oregon
    Offices(s): Bonneville Power Administration

  • December 27, 2012

    Continuation of Yakama Nation Sturgeon Management Project
    CX(s) Applied: B1.20
    Date: 12/27/2012
    Location(s): Washington, Washington
    Offices(s): Bonneville Power Administration

  • December 27, 2012

    Sale of Lakeside Radio Station
    CX(s) Applied: B1.24
    Date: 12/27/2012
    Location(s): Oregon
    Offices(s): Bonneville Power Administration

  • December 27, 2012

    Williams Northwest Pipeline Land Use Review Request
    CX(s) Applied: B4.9
    Date: 12/27/2012
    Location(s): Washington
    Offices(s): Bonneville Power Administration

  • December 27, 2012

    Finely Creek and North Valley Creek Property Funding
    CX(s) Applied: B1.25
    Date: 12/27/2012
    Location(s): Montana, Montana
    Offices(s): Bonneville Power Administration

  • December 21, 2012

    Columbia Rural Electric Association Walla Walla Hydroelectric Project
    CX(s) Applied: B4.1
    Date: 12/21/2012
    Location(s): Washington
    Offices(s): Bonneville Power Administration

  • December 19, 2012

    Improve the Access Road System in Miles 4, 5, 16, 17, 18, and 30 of the Lower Granite-Hatwai Transmission Line
    CX(s) Applied: B1.3, B1.13
    Date: 12/19/2012
    Location(s): Washington, Idaho
    Offices(s): Bonneville Power Administration

  • December 17, 2012

    Pasco Land Acquisition
    CX(s) Applied: B1.24
    Date: 12/17/2012
    Location(s): Washington
    Offices(s): Bonneville Power Administration

  • December 6, 2012

    Lane Substation 500/230-kV Transformer Phase Separation Project
    CX(s) Applied: B4.6
    Date: 12/06/2012
    Location(s): Oregon
    Offices(s): Bonneville Power Administration

  • December 4, 2012

    Alcoa Power Sales Contract
    CX(s) Applied: B4.1
    Date: 12/04/2012
    Location(s): Oregon, Washington
    Offices(s): Bonneville Power Administration

  • December 4, 2012

    Keeler Substation-Control House Expansion
    CX(s) Applied: B4.11
    Date: 12/04/2012
    Location(s): Oregon
    Offices(s): Bonneville Power Administration

  • December 3, 2012

    FY13 Environmental Drainage Upgrades at Bonneville Power Administration’s Clatsop, Garrison, Lexington, Mapleton, Ovando, Pearl, and Wren Substations
    CX(s) Applied: B4.6
    Date: 12/03/2012
    Location(s): Oregon, Montana, Washington, Oregon, Oregon
    Offices(s): Bonneville Power Administration

  • November 29, 2012

    Spring Creek – Wine County No. 1 Transmission Tower Relocation
    CX(s) Applied: B4.6
    Date: 11/29/2012
    Location(s): Oregon
    Offices(s): Bonneville Power Administration

  • November 29, 2012

    Wood Pole Replacements Along the Drummond-Macks Inn, Macks Inn-Madison, and Swan Valley-Teton 115-kilovolt Transmission Line Rights-of-Way
    CX(s) Applied: B1.3
    Date: 11/29/2012
    Location(s): Idaho, Idaho
    Offices(s): Bonneville Power Administration

  • November 8, 2012

    Snohomish Substation Control House Expansion & Seismic Retrofit
    CX(s) Applied: B4.11
    Date: 11/08/2012
    Location(s): Washington
    Offices(s): Bonneville Power Administration

  • November 8, 2012

    Tualatin River Pipeline Crossing Site- Monitoring Well Redevelopment
    CX(s) Applied: B4.9
    Date: 11/08/2012
    Location(s): Oregon, Oregon
    Offices(s): Bonneville Power Administration

  • November 8, 2012

    Tide Creek Property Funding
    CX(s) Applied: B1.25
    Date: 11/08/2012
    Location(s): Oregon
    Offices(s): Bonneville Power Administration

  • November 1, 2012

    Tucannon River Substation Expansion Project
    CX(s) Applied: B4.6
    Date: 11/01/2012
    Location(s): Washington
    Offices(s): Bonneville Power Administration