National Oceanic and Atmospheric Administration (NOAA) Birch Creek Canyon Wind Study
CX(s) Applied: B3.1
Date: 12/17/2012
Location(s): Idaho
Offices(s): Idaho Operations Office
Categorical Exclusion Determinations issued by Idaho Operations Office.
DOCUMENTS AVAILABLE FOR DOWNLOAD
-
December 17, 2012
-
December 15, 2012
INTEC – U-233 Waste Stream Disposition
CX(s) Applied: NO CX GIVEN
Date: 12/15/2012
Location(s): Idaho
Offices(s): Idaho Operations Office -
December 5, 2012
Advanced Test Reactor (ATR) Transition to Commercial Power
CX(s) Applied: B2.5
Date: 12/05/2012
Location(s): Idaho
Offices(s): Idaho Operations Office -
November 29, 2012
Upgrade to the Concrete Masonry Unit (CMU) Wall at Test Reactor Area (TRA)-670
CX(s) Applied: B2.5
Date: 11/29/2012
Location(s): Idaho
Offices(s): Idaho Operations Office -
November 23, 2012
INTEC – Suspect RH-TRU (AMWTP)
CX(s) Applied: NO CX GIVEN
Date: 11/23/2012
Location(s): Idaho
Offices(s): Idaho Operations Office -
November 6, 2012
CPP-684 – Remote Analytical Laboratory Facility Modifications
CX(s) Applied: B1.28
Date: 11/06/2012
Location(s): Idaho
Offices(s): Idaho Operations Office -
November 6, 2012
ICP Routine Maintenance
CX(s) Applied: B1.3
Date: 11/06/2012
Location(s): Idaho
Offices(s): Idaho Operations Office -
July 11, 2012
High Frequency Sounder - Permanent Installation at Water Reactor Research Test Facility
CX(s) Applied: B1.19
Date: 07/11/2012
Location(s): Idaho
Offices(s): Idaho Operations Office -
July 9, 2012
Zero Power Physics Reactor Surveillance Glove Box
CX(s) Applied: B2.5
Date: 07/09/2012
Location(s): Idaho
Offices(s): Idaho Operations Office -
July 5, 2012
Idaho National Laboratory Administration Building (IAB)Telephone Room 112 Heating, Ventilating, and Air Conditioning (HVAC) Upgrade
CX(s) Applied: B1.4
Date: 07/05/2012
Location(s): Idaho
Offices(s): Idaho Operations Office -
July 5, 2012
Rexburg Bus Lot Lease Termination
CX(s) Applied: B1.24
Date: 07/05/2012
Location(s): Idaho
Offices(s): Idaho Operations Office -
June 27, 2012
Materials and Fuel Complex – Sodium Processing Facility Tank System Resource Conservation and Recovery Act Closure
CX(s) Applied: B6.1
Date: 06/27/2012
Location(s): Idaho
Offices(s): Idaho Operations Office -
June 25, 2012
Reverse Osmosis System Removal
CX(s) Applied: B1.26
Date: 06/25/2012
Location(s): Idaho
Offices(s): Idaho Operations Office -
June 7, 2012
M-10 Emergency Pump Backup Power
CX(s) Applied: B2.5
Date: 06/07/2012
Location(s): Idaho
Offices(s): Idaho Operations Office -
June 7, 2012
Materials and Fuels Complex Underground and Aboveground Storage Tank Replacement
CX(s) Applied: B2.5
Date: 06/07/2012
Location(s): Idaho
Offices(s): Idaho Operations Office -
May 28, 2012
Infrastructure for Advanced Reactor Materials Center
CX(s) Applied: B2.2
Date: 05/28/2012
Location(s): Idaho
Offices(s): Idaho Operations Office -
May 24, 2012
Infrastructure Upgrade of Radiation Measurement and Spectroscopy Laboratory at Missouri University of Science and Technology
CX(s) Applied: B1.2
Date: 05/24/2012
Location(s): Idaho
Offices(s): Idaho Operations Office -
May 23, 2012
Upgrading Lanthanide & Actinide Spectroscopy Capabilities at Washington State University
CX(s) Applied: B3.6
Date: 05/23/2012
Location(s): Idaho
Offices(s): Idaho Operations Office -
May 22, 2012
Implementation of a Low-Level Gamma-Ray Counting Facility – University of Texas at Austin
CX(s) Applied: B3.6
Date: 05/22/2012
Location(s): Idaho
Offices(s): Idaho Operations Office -
May 22, 2012
Determination of Microstructure and Chemical State Changes in Ion-Irradiated Fuels and Structural Components with a High Kinetic Energy Electron Detector – Illinois Institute of Technology
CX(s) Applied: B3.6
Date: 05/22/2012
Location(s): Idaho
Offices(s): Idaho Operations Office -
May 22, 2012
Building Calorimetric and Thermogravimetric Analytical Instrumentation Capability at Oregon State University
CX(s) Applied: B3.6
Date: 05/22/2012
Location(s): Idaho
Offices(s): Idaho Operations Office -
May 22, 2012
Nuclear Engineering and Science Equipment to Enhance Education and Research in Nuclear and Radiological Engineering at the Georgia Institute of Technology
CX(s) Applied: B3.6
Date: 05/22/2012
Location(s): Idaho
Offices(s): Idaho Operations Office -
May 21, 2012
Idaho National Laboratory (INL) Administration Building (IAB) Communication Room Heating, Ventilation, and Air Conditioning (HVAC) Upgrade
CX(s) Applied: B1.31
Date: 05/21/2012
Location(s): Idaho
Offices(s): Idaho Operations Office -
May 21, 2012
Department of Energy-Idaho/Radiological and Environmental Sciences Laboratory Wavelength-Dispersive X-Ray Spectrometer for Chemistry Research & Development
CX(s) Applied: B3.6
Date: 05/21/2012
Location(s): Idaho
Offices(s): Idaho Operations Office -
May 21, 2012
Automated Serial Sectioning and Imaging in Support of Nuclear Materials Analysis – Colorado School of Mines
CX(s) Applied: B3.6
Date: 05/21/2012
Location(s): Idaho
Offices(s): Idaho Operations Office