Chrysler Group LLC, Revised Specific Project Application 2, Retooling, Reequipping and Engineering
CX(s) Applied: B1.31, B5.1
Date: 09/06/2011
Location(s): Auburn Hills, Michigan
Office(s): Advanced Technology Vehicles Manufacturing Loan Program, Loan Guarantee Program Office
Categorical Exclusion Determinations issued by Loan Guarantee Program Office.
DOCUMENTS AVAILABLE FOR DOWNLOAD
-
September 6, 2011
-
July 28, 2011
Project Eagle Direct Water Manufacturing Plants
CX(s) Applied: B1.23, B1.31
Date: 07/28/2011
Location(s): Lexington, Massachusetts
Office(s): Advanced Technology Vehicles Manufacturing Loan Program, Loan Guarantee Program Office -
June 20, 2011
Aptera All-Electric and Hybrid Electric Vehicles
CX(s) Applied: B1.31, B5.1
Date: 06/20/2011
Location(s): Grand Rapids, Michigan
Office(s): Advanced Technology Vehicles Manufacturing Loan Program, Loan Guarantee Program Office -
June 16, 2011
OPOC Engine Manufacturing Project
CX(s) Applied: B1.31, B5.1
Date: 06/16/2011
Location(s): Troy, Michigan
Office(s): Advanced Technology Vehicles Manufacturing Loan Program, Loan Guarantee Program Office -
May 23, 2011
Calisolar 16,000 Metric Ton Upgraded Metallurgical-grade Silicon Manufacturing Facility
CX(s) Applied: B1.31
Date: 05/23/2011
Location(s): Ontario, Ohio
Office(s): Loan Guarantee Program Office -
March 4, 2011
Solar Junction's 100 Megawatt Manufacturing Line
CX(s) Applied: B1.31
Date: 03/04/2011
Location(s): San Jose, California
Office(s): Loan Guarantee Program Office -
March 2, 2011
San Emidio Geothermal Power Plant Energy Efficiency Upgrades
CX(s) Applied: B3.7, B5.1
Date: 03/02/2011
Location(s): Washoe County, Nevada
Office(s): Loan Guarantee Program Office -
January 28, 2011
Bright Plug-In Hybrid Electric Vehicle
CX(s) Applied: B1.31, B5.1
Date: 01/28/2011
Location(s): Rochester Hills, Michigan
Office(s): Loan Guarantee Program Office -
January 5, 2011
Copper Indium Gallium Sulfur-Selenide (CIGSS) Manufacturing Plant
CX(s) Applied: B1.31
Date: 01/05/2011
Location(s): San Jose, California
Office(s): Loan Guarantee Program Office -
December 21, 2010
Transform Solar Manufacturing Project
CX(s) Applied: B1.31
Date: 12/21/2010
Location(s): Boise, Idaho
Office(s): Loan Guarantee Program Office -
September 23, 2010
Carbon Motors Corporation E7 Assembly Facility
CX(s) Applied: B1.31
Date: 09/23/2010
Location(s): Connersville, Indiana
Office(s): Advanced Technology Vehicles Manufacturing Loan Program, Loan Guarantee Program Office -
September 23, 2010
Vehicle Production Group LLC, MV-1 Assembly Facility
CX(s) Applied: B1.31, B5.1
Date: 09/23/2010
Location(s): Mishawaka, Indiana
Office(s): Advanced Technology Vehicles Manufacturing Loan Program, Loan Guarantee Program Office -
June 28, 2010
AES ES Westover LLC, Project Dyno Electric Grid Stability Advanced Battery Systems
CX(s) Applied: B2.5
Date: 06/28/2010
Location(s): Johnson City, New York
Office(s): Loan Guarantee Program Office