Eni USA Gas Marketing, LLC
CX(s) Applied: B5.7
Date: 02/06/2013
Location(s): Louisiana
Offices(s): Fossil Energy
Location
Categorical Exclusion Determinations issued for actions in Louisiana.
DOCUMENTS AVAILABLE FOR DOWNLOAD
-
February 6, 2013
-
January 23, 2013
Blast and Paint West Hackberry, Texas 22 Header Piping
CX(s) Applied: B1.3
Date: 01/23/2013
Location(s): Louisiana
Offices(s): Strategic Petroleum Reserve Field Office -
January 15, 2013
Sempra Liquid Natural Gas Marketing, LLC
CX(s) Applied: B5.7
Date: 01/15/2013
Location(s): Louisiana
Offices(s): Fossil Energy -
January 15, 2013
Sempra LNG Marketing, Inc.
CX(s) Applied: B5.7
Date: 01/15/2013
Location(s): California, Louisiana
Offices(s): Fossil Energy -
January 2, 2013
Strategic Petroleum Reserve Site Subsidence Surveys, 2013-2017
CX(s) Applied: B3.1
Date: 01/02/2013
Location(s): Louisiana, Texas, Texas, Louisiana
Offices(s): Strategic Petroleum Reserve Field Office -
December 12, 2012
Pumping System for 100 MBD Cavern Capacity Maintenance
CX(s) Applied: B1.15
Date: 12/12/2012
Location(s): Texas, Louisiana, Texas
Offices(s): Strategic Petroleum Reserve Field Office -
December 11, 2012
Loss of a Major Transformer at Bryan Mound or West Hackberry
CX(s) Applied: B1.3
Date: 12/11/2012
Location(s): Texas, Louisiana
Offices(s): Strategic Petroleum Reserve Field Office -
November 29, 2012
Chevron U.S.A. Inc.
CX(s) Applied: B5.7
Date: 11/29/2012
Location(s): Louisiana, California
Offices(s): Fossil Energy -
November 26, 2012
Replace Bayou Choctaw Warehouse Firewater Piping
CX(s) Applied: B1.3
Date: 11/26/2012
Location(s): Louisiana
Offices(s): Strategic Petroleum Reserve Field Office -
September 18, 2012
New Orleans Emergency Generator Installation (900 Building)
CX(s) Applied: B1.31
Date: 09/18/2012
Location(s): Louisiana
Offices(s): Strategic Petroleum Reserve Field Office -
August 30, 2012
Louisiana State Energy Program (Formula Grant)
CX(s) Applied: A9, A11
Date: 08/30/2012
Location(s): Louisiana
Offices(s): Golden Field Office -
August 28, 2012
Repair West Hackberry Brine Tanks, WHT-14 & WHT-15
CX(s) Applied: B1.3
Date: 08/28/2012
Location(s): Louisiana
Offices(s): Strategic Petroleum Reserve Field Office -
August 16, 2012
Variable Frequency Drivers for Raw Water Intake Structure Pumps Government Furnished Equipment
CX(s) Applied: B1.3
Date: 08/16/2012
Location(s): Texas, Texas, Louisiana
Offices(s): Strategic Petroleum Reserve Field Office -
August 14, 2012
Dredging of the West Hackberry Raw Water Intake Structure
CX(s) Applied: B1.3
Date: 08/14/2012
Location(s): Louisiana
Offices(s): Strategic Petroleum Reserve Field Office -
July 26, 2012
Install Power Metering for Strategic Petroleum Reserve Site Buildings
CX(s) Applied: B1.31
Date: 07/26/2012
Location(s): Louisiana, Texas, Texas, Louisiana
Offices(s): Strategic Petroleum Reserve Field Office -
June 18, 2012
State Energy Program - Grant Parish Transportation Project
CX(s) Applied: B5.22
Date: 06/18/2012
Location(s): Louisiana
Offices(s): Golden Field Office -
June 14, 2012
More Improvements to Deepwater Subsea Measurement
CX(s) Applied: B3.6
Date: 06/14/2012
Location(s): Texas, Louisiana, New York, Oklahoma, Scotland
Offices(s): National Energy Technology Laboratory -
June 8, 2012
Louisiana-City-Lafayette
CX(s) Applied: A1, A9, A11, B1.32, B2.5, B5.1
Date: 06/08/2012
Location(s): Louisiana
Offices(s): Energy Efficiency and Renewable Energy -
June 1, 2012
Cheniere Marketing, LLC
CX(s) Applied: B5.7
Date: 06/01/2012
Location(s): Louisiana
Offices(s): Fossil Energy -
May 18, 2012
Access to Remote Valve Station West Hackberry -2
CX(s) Applied: B1.3
Date: 05/18/2012
Location(s): Louisiana
Offices(s): Strategic Petroleum Reserve Field Office -
May 8, 2012
Clean, Seal, and Paint West Hackberry Buildings RW MCC 392, Substation 390 and MCC 317
CX(s) Applied: B1.3
Date: 05/08/2012
Location(s): Louisiana
Offices(s): Strategic Petroleum Reserve Field Office -
May 3, 2012
Remove Abandoned Bayou Choctaw Timber Bridge Over North/South Canal
CX(s) Applied: B1.23
Date: 05/03/2012
Location(s): Louisiana
Offices(s): Strategic Petroleum Reserve Field Office -
April 16, 2012
Replace Big Hill Raw Water Intake System Oil Water Separator Tank with Concrete Tank
CX(s) Applied: B1.3
Date: 04/16/2012
Location(s): Louisiana
Offices(s): Strategic Petroleum Reserve Field Office -
April 16, 2012
West Hackberry Building 301 Air Handling Unit-1 Heating, Ventilation, and Air Conditioning Replacement
CX(s) Applied: B1.4
Date: 04/16/2012
Location(s): Louisiana
Offices(s): Strategic Petroleum Reserve Field Office -
April 10, 2012
Replacement Anode Bed on West Hackberry 42-inch Crude Oil Pipeline at Gum Cove Road
CX(s) Applied: B1.3
Date: 04/10/2012
Location(s): Louisiana
Offices(s): Strategic Petroleum Reserve Field Office