High Density Fuel Material for Light Water Reactors (LWRs)
CX(s) Applied: B1.31
Date: 01/14/2013
Location(s): Idaho
Offices(s): Nuclear Energy
Categorical Exclusion Determinations issued by Nuclear Energy.
DOCUMENTS AVAILABLE FOR DOWNLOAD
-
January 14, 2013
-
October 18, 2012
Central Facilities Area (CFA)-696 Gasoline Tank Installation
CX(s) Applied: B2.5
Date: 10/18/2012
Location(s): Idaho
Offices(s): Nuclear Energy -
October 16, 2012
Idaho Falls Power - Willow Creek Building Conduit Installation
CX(s) Applied: B4.7
Date: 10/16/2012
Location(s): Idaho
Offices(s): Nuclear Energy -
September 25, 2012
Development of Light Water Reactor Fuels with Enhanced Accident Tolerance - AREVA Federal Services LLC
CX(s) Applied: B3.6, B3.15
Date: 09/25/2012
Location(s): Florida, Wisconsin
Offices(s): Nuclear Energy -
September 25, 2012
Development of Light Water Reactor Fuels Enhanced Accident Tolerance - Westinghouse Electric Company LLC
CX(s) Applied: B3.6
Date: 09/25/2012
Location(s): New Mexico
Offices(s): Nuclear Energy -
August 30, 2012
Radiological Dispersal Device (RDD)/Improvised Nuclear Device (IND) Material Training Activities and Evaluations Using Radiation Emitting Sources/Material/Devices - Overarching
CX(s) Applied: B1.2
Date: 08/30/2012
Location(s): Idaho
Offices(s): Nuclear Energy -
August 20, 2012
Innovative Manufacturing Process for Improving the Erosion/Corrosion Resistance of Power Plant Components via Powder Metallurgy & Hot Isostatic Processing Methods โ Electric Power Research Institute
CX(s) Applied: B3.6
Date: 08/20/2012
Location(s): CX: none
Offices(s): Nuclear Energy -
August 20, 2012
Study of Intermetallic Nanostructures for Light-water Reactor Materials โ Regents of the University of California
CX(s) Applied: B3.6
Date: 08/20/2012
Location(s): California
Offices(s): Nuclear Energy -
August 9, 2012
SiC-SiC Composite for Fuel Structure Applications โ Electric Power Research Institute
CX(s) Applied: B3.6
Date: 08/09/2012
Location(s): CX: none
Offices(s): Nuclear Energy -
April 26, 2012
Test Reactor Area (TRA)-1710 Radioactive Materials Storage Area
CX(s) Applied: B2.5
Date: 04/26/2012
Location(s): Idaho
Offices(s): Nuclear Energy -
April 18, 2012
Geotechnical Core Drilling for USGS 138
CX(s) Applied: B3.1
Date: 04/18/2012
Location(s): Idaho
Offices(s): Nuclear Energy -
April 7, 2012
Idaho National Laboratory (INL) Closed Circuit Television (CCTV) Replacement Project
CX(s) Applied: B2.2
Date: 04/07/2012
Location(s): Idaho
Offices(s): Nuclear Energy -
March 21, 2012
Central Facilities Area (CFA) Shoot House Panel Installation
CX(s) Applied: B2.1
Date: 03/21/2012
Location(s): Idaho
Offices(s): Nuclear Energy -
March 21, 2012
International Way Office Building Lease Termination
CX(s) Applied: B1.24
Date: 03/21/2012
Location(s): Idaho
Offices(s): Nuclear Energy -
March 15, 2012
Materials and Fuels Complex (MFC) Contaminated Equipment Storage Building (CESB) Conversion Scope Change
CX(s) Applied: B1.31
Date: 03/15/2012
Location(s): Idaho
Offices(s): Nuclear Energy -
November 28, 2011
Rensselaer Infrastructure Upgrade to Enhance Research and Education in Nuclear Engineering - Rensselaer Polytechnic Institute
CX(s) Applied: B3.6
Date: 11/28/2011
Location(s): New York
Offices(s): Nuclear Energy, Idaho Operations Office -
November 28, 2011
An Integrated Upgrade of Scientific Equipment for Strengthening the Research and Education in Nuclear Energy at the Ohio State University
CX(s) Applied: B1.2, B3.6
Date: 11/28/2011
Location(s): Ohio
Offices(s): Nuclear Energy, Idaho Operations Office -
November 28, 2011
Idaho National Laboratory Asphalt Repair Project - North Wind Services, LLC
CX(s) Applied: B1.3
Date: 11/28/2011
Location(s): Idaho
Offices(s): Nuclear Energy, Idaho Operations Office -
November 28, 2011
Nuclear Energy University Programs Minor Reactor Upgrade Request for Enhancement of Safety and Operational Monitoring Systems and Research Capabilities of the Ohio State University Nuclear Reactor Laboratory
CX(s) Applied: B2.2
Date: 11/28/2011
Location(s): Ohio
Offices(s): Nuclear Energy, Idaho Operations Office -
November 28, 2011
Meeting Nuclear Uniform Curriculum Program Requirements with Equipment Investments - Lakeshore Technical College
CX(s) Applied: B1.2
Date: 11/28/2011
Location(s): Wisconsin
Offices(s): Nuclear Energy, Idaho Operations Office -
November 28, 2011
Nuclear Infrastructure Upgrade to Enhance Teaching Capabilities in the Nuclear Systems Technology Program at Midlands Technical College
CX(s) Applied: B1.28
Date: 11/28/2011
Location(s): South Carolina
Offices(s): Nuclear Energy, Idaho Operations Office -
November 28, 2011
General Infrastructure to Enhance Nuclear Materials Research and Education at the University of Nevada, Reno
CX(s) Applied: B3.6
Date: 11/28/2011
Location(s): Nevada
Offices(s): Nuclear Energy, Idaho Operations Office -
November 28, 2011
Upgrade of Missouri Science and Technology Reactor for Distance Learning - Missouri University of Science and Technology
CX(s) Applied: B1.7
Date: 11/28/2011
Location(s): Missouri
Offices(s): Nuclear Energy, Idaho Operations Office -
November 28, 2011
Reactor Upgrade Grant - Rhode Island Atomic Energy Commission
CX(s) Applied: B2.2
Date: 11/28/2011
Location(s): Rhode Island
Offices(s): Nuclear Energy, Idaho Operations Office -
November 28, 2011
Acquisition of a 3 Megavolt Tandem Accelerator for Research and Teaching in Nuclear Science and Engineering - University of Michigan
CX(s) Applied: B3.10
Date: 11/28/2011
Location(s): Michigan
Offices(s): Nuclear Energy, Idaho Operations Office