L-Area River Water Valve V-022 Bypass and Piping
CX(s) Applied: B1.3
Date: 01/29/2013
Location(s): South Carolina
Offices(s): Savannah River Operations Office
Categorical Exclusion Determinations issued by Savannah River Operations Office.
DOCUMENTS AVAILABLE FOR DOWNLOAD
-
January 29, 2013
-
January 29, 2013
Energy Frontiers Research Center - Nanoscale Actinide Materials
CX(s) Applied: B3.6
Date: 01/29/2013
Location(s): South Carolina
Offices(s): Savannah River Operations Office -
January 29, 2013
H1616 O-Ring Aging Studies
CX(s) Applied: B3.6
Date: 01/29/2013
Location(s): South Carolina
Offices(s): Savannah River Operations Office -
January 29, 2013
Cleaning of Uncontaminated Steel 3013 and 9975 Parts (Actual and Mockup)
CX(s) Applied: B3.6
Date: 01/29/2013
Location(s): South Carolina
Offices(s): Savannah River Operations Office -
January 28, 2013
Iodine Speciation
CX(s) Applied: B3.6
Date: 01/28/2013
Location(s): South Carolina
Offices(s): Savannah River Operations Office -
January 28, 2013
2H Evaporator Scale Sample Analysis
CX(s) Applied: B3.6
Date: 01/28/2013
Location(s): South Carolina
Offices(s): Savannah River Operations Office -
January 28, 2013
Miscellaneous Housekeeping Tasks Around 245-F/245-1F
CX(s) Applied: B1.28
Date: 01/28/2013
Location(s): South Carolina
Offices(s): Savannah River Operations Office -
January 28, 2013
Installing Vent/Drain on Inlet Headers of 292-H Recycle Vessel Vent Fans
CX(s) Applied: B2.5
Date: 01/28/2013
Location(s): South Carolina
Offices(s): Savannah River Operations Office -
January 28, 2013
Stiffen Canyon Exhaust Fan 3 Motor Pedestal
CX(s) Applied: B2.5
Date: 01/28/2013
Location(s): South Carolina
Offices(s): Savannah River Operations Office -
January 28, 2013
242-16H Evaporator Acid Cleaning Process
CX(s) Applied: B1.3
Date: 01/28/2013
Location(s): South Carolina
Offices(s): Savannah River Operations Office -
January 28, 2013
F-08 Industrial Wastewater Outfall Flow Measurement Improvements
CX(s) Applied: B3.1
Date: 01/28/2013
Location(s): South Carolina
Offices(s): Savannah River Operations Office -
January 24, 2013
Actinide Removal Process /Modular Caustic Side Solvent Extraction Unit Life Extension Support Testing
CX(s) Applied: B3.6
Date: 01/24/2013
Location(s): South Carolina
Offices(s): Savannah River Operations Office -
January 22, 2013
Removal of Glass Feed Prep System from 786-A (EDL)
CX(s) Applied: B1.23
Date: 01/22/2013
Location(s): South Carolina
Offices(s): Savannah River Operations Office -
January 22, 2013
Non-radioactive Simulant Testing of Impacts of the DWPF Alternative Reductant on the Tank Farm Evaporator
CX(s) Applied: B3.6
Date: 01/22/2013
Location(s): South Carolina
Offices(s): Savannah River Operations Office -
January 17, 2013
Environmental Biotechnology General Laboratory Operations
CX(s) Applied: B3.6
Date: 01/17/2013
Location(s): South Carolina
Offices(s): Savannah River Operations Office -
January 17, 2013
Deactivation and Decommissioning of Soil Vapor Extraction Units
CX(s) Applied: B1.23
Date: 01/17/2013
Location(s): South Carolina
Offices(s): Savannah River Operations Office -
January 17, 2013
Power to H-1Y Laydown Yard
CX(s) Applied: B2.1
Date: 01/17/2013
Location(s): South Carolina
Offices(s): Savannah River Operations Office -
January 17, 2013
Flame Forming Proppants
CX(s) Applied: B3.6
Date: 01/17/2013
Location(s): South Carolina
Offices(s): Savannah River Operations Office -
January 15, 2013
Deactivation and Decommissioning of Soil Vapor Extraction Units
CX(s) Applied: B1.23
Date: 01/15/2013
Location(s): South Carolina
Offices(s): Savannah River Operations Office -
January 15, 2013
Savannah River National Laboratory Electrolyzer 30 weight % Sulfuric Acid pH Adjustment
CX(s) Applied: B3.6
Date: 01/15/2013
Location(s): South Carolina
Offices(s): Savannah River Operations Office -
January 15, 2013
Separation of the Minor Actinides from the Lanthanides with Magnetic Fields
CX(s) Applied: B3.6
Date: 01/15/2013
Location(s): South Carolina
Offices(s): Savannah River Operations Office -
December 19, 2012
723-A Distribution Panel 4 (DB4) Replacement
CX(s) Applied: B1.3
Date: 12/19/2012
Location(s): South Carolina
Offices(s): Savannah River Operations Office -
December 19, 2012
Analytical Support For Unpolished Plutonium Oxide Production (UPOP) Campaign
CX(s) Applied: B3.6
Date: 12/19/2012
Location(s): South Carolina
Offices(s): Savannah River Operations Office -
December 19, 2012
Installation of a Ballymore Ladder at Sampling Location 4MC-002F
CX(s) Applied: B2.3
Date: 12/19/2012
Location(s): South Carolina
Offices(s): Savannah River Operations Office -
December 18, 2012
288-F Ash Basin Landfill Closure
CX(s) Applied: B6.1
Date: 12/18/2012
Location(s): South Carolina
Offices(s): Savannah River Operations Office