Treatment and Beneficial Reuse of Produced Waters Using a Novel Pervaporation-Based Irrigation Technique
CX(s) Applied: A9, A11, B3.6
Date: 04/16/2013
Location(s): Wyoming
Offices(s): National Energy Technology Laboratory
Location
Categorical Exclusion Determinations issued for actions in Wyoming.
DOCUMENTS AVAILABLE FOR DOWNLOAD
-
April 16, 2013
-
March 26, 2013
Urban Transmission Line Danger Tree Management
CX(s) Applied: B1.3
Date: 03/26/2013
Location(s): Colorado, Colorado, Colorado, Colorado, Wyoming
Offices(s): Western Area Power Administration-Rocky Mountain Region -
February 7, 2013
Nalco / Total Flow Loop Polymer Test
CX(s) Applied: B1.6, B1.13, B1.18
Date: 02/07/2013
Location(s): Wyoming
Offices(s): RMOTC -
January 16, 2013
Lusk Rural Substation Control Building Construction
CX(s) Applied: B1.3
Date: 01/16/2013
Location(s): Wyoming
Offices(s): Western Area Power Administration-Rocky Mountain Region -
January 15, 2013
Urban Transmission Line Danger Tree Management
CX(s) Applied: B1.3
Date: 01/15/2013
Location(s): Colorado, Colorado, Colorado, Colorado, Wyoming
Offices(s): Western Area Power Administration-Rocky Mountain Region -
January 11, 2013
Copper Mountain to Boysen 34.5 Kilovolt Transmission Line Structure Replacement
CX(s) Applied: B1.3
Date: 01/11/2013
Location(s): Wyoming
Offices(s): Western Area Power Administration-Rocky Mountain Region -
September 28, 2012
Bucknum Substation Construction
CX(s) Applied: B4.11
Date: 09/28/2012
Location(s): Wyoming
Offices(s): Western Area Power Administration-Rocky Mountain Region -
September 21, 2012
Optimal Model Complexity in Geological Carbon Sequestration
CX(s) Applied: A9
Date: 09/21/2012
Location(s): Wyoming
Offices(s): National Energy Technology Laboratory -
September 20, 2012
Casper Service Center Garage Door Insulation
CX(s) Applied: B1.3
Date: 09/20/2012
Location(s): Wyoming
Offices(s): Western Area Power Administration-Rocky Mountain Region -
September 12, 2012
Grazing Agreement Amendment to Legacy Management #8-12, Acid Pond Property Disposition Near the Spook, Wyoming, Disposal Site
CX(s) Applied: B1.24
Date: 09/12/2012
Location(s): Wyoming
Offices(s): Legacy Management -
August 29, 2012
Optimizing Accuracy of Determinations of Carbon Dioxide Storage Capacity and Permanence
CX(s) Applied: A1, A9, B3.6
Date: 08/29/2012
Location(s): Wyoming
Offices(s): National Energy Technology Laboratory -
July 30, 2012
Line Switch Replacements at Guernsey Rural, Worland, Refinery, Box Butte, and Morrill Taps
CX(s) Applied: B4.6, B4.11
Date: 07/30/2012
Location(s): Wyoming, Nebraska
Offices(s): Western Area Power Administration-Rocky Mountain Region -
July 23, 2012
License Outgrant to Owl Creek Water District Town of Thermopolis, Hot Springs County, Wyoming
CX(s) Applied: B4.9
Date: 07/23/2012
Location(s): Wyoming
Offices(s): Western Area Power Administration-Rocky Mountain Region -
July 23, 2012
Interstate Electrification Improvement
CX(s) Applied: B5.1
Date: 07/23/2012
Location(s): Wyoming
Offices(s): National Energy Technology Laboratory -
July 17, 2012
Buried Flow Line from 32-A-34 to 34-AX-34
CX(s) Applied: B2.5, B5.2, B5.4
Date: 07/17/2012
Location(s): Wyoming
Offices(s): RMOTC -
July 17, 2012
Buried Flow Line from 32-A-34 to 34-AX-34
CX(s) Applied: B2.5, B5.2, B5.4
Date: 07/17/2012
Location(s): Wyoming
Offices(s): RMOTC -
July 13, 2012
Acid Pond Property Disposition Near the Spook, Wyoming, Disposal Site
CX(s) Applied: B1.24, B1.36
Date: 07/13/2012
Location(s): Wyoming
Offices(s): Legacy Management -
July 2, 2012
Boysen-Thermopolis 115 Kilowolt Transmission Line Structure 15/6 Pole Replacement Project Fremont County, Wyoming
CX(s) Applied: B4.6
Date: 07/02/2012
Location(s): Wyoming
Offices(s): Western Area Power Administration-Rocky Mountain Region -
July 2, 2012
Lovell, Basin, and Buffalo Bill Substations, Control Building Rehabilitation Projects Big Horn and Park Counties, Wyoming
CX(s) Applied: B1.3, B1.4
Date: 07/02/2012
Location(s): Wyoming
Offices(s): Western Area Power Administration-Rocky Mountain Region -
June 27, 2012
Buried Flow Line from T-2-34 to T-1-33
CX(s) Applied: B2.5, B5.2, B5.4
Date: 06/27/2012
Location(s): Wyoming
Offices(s): RMOTC -
June 27, 2012
Buried Flow Line from T-2-34 to T-1-33
CX(s) Applied: B2.5, B5.2, B5.4
Date: 06/27/2012
Location(s): Wyoming
Offices(s): RMOTC -
June 26, 2012
Wyoming Program Year 2012 Formula Grants - State Energy Program
CX(s) Applied: A9, A11
Date: 06/26/2012
Location(s): Wyoming
Offices(s): Golden Field Office -
June 18, 2012
Platform Construction for Power Pole Work
CX(s) Applied: B1.13, B2.5, B4.6
Date: 06/18/2012
Location(s): Wyoming
Offices(s): RMOTC -
June 18, 2012
Platform Construction for Power Pole Work
CX(s) Applied: B1.13, B2.5, B4.6
Date: 06/18/2012
Location(s): Wyoming
Offices(s): RMOTC -
June 12, 2012
Power Circuit Breaker Replacement Project
CX(s) Applied: B4.6
Date: 06/12/2012
Location(s): Washington, Oregon, Idaho, Montana, Wyoming
Offices(s): Bonneville Power Administration