CX-006835: Categorical Exclusion Determination

241-T Tank Farm Debris Barrier Fence
CX(s) Applied: B1.11
Date: 08/22/2011
Location(s): Richland, Washington
Office(s): River Protection-Richland Operations Office, Golden Field Office

A sand and debris barrier fence approximately 1,600 linear feet long will be constructed utilizing Ecology blocks, metal 8 foot T-posts, and wood lathe fencing in an area located immediately to the west of the 241-T tank farm. The ground outside of the western Tank farm fence line will be graded, then fencing materials will be delivered and installed.