Transmission System Vegetation Management Program
Vegetation Management for the Ashe-Marion #2 500 kV transmission line from structure 150/2 through structure 157/7. Bonneville Power Administration proposes to remove unwanted vegetation along the right-of-way, access roads and around tower structures along the subject transmission line corridors.