Transmission System Vegetation Management Program
Vegetation Management along the Trojan-Allston Transmission Lines 1 and 2 Right Of Ways between 1/1 and 9/1. The lines are 230 kV Single Circuit Transmission Lines having an easement width of 125 feet. (April 2002)