You are here

Washington

March 1, 2012
The new resin was installed at the 100-DX Groundwater Treatment Facility, where it operated over one year without a single resin change.
New Resin Improves Efficiency, Reduces Costs in Hanford Site Groundwater Treatment

RICHLAND, Wash. – A new resin EM, the Richland Operations Office, and contractor CH2M HILL Plateau Remediation Company are using in contaminated groundwater treatment is expected to increase efficiency and reduce costs in the operation of pump-and-treat facilities along the Columbia River at the Hanford site.

March 1, 2012
Registration Date Set for 2012 Hanford Site Wide Tours

RICHLAND, Wash. – The U.S. Department of Energy (DOE) will open online registration on Tuesday, March 6, 2012, for its popular tours of the Hanford Site.

February 23, 2012
Small Business Summit - Coming to Washington State this April

You’re invited to join our next Small Business Summit this April. Bridging Partnerships Small Business Symposium will be held April 18-19, 2012 in Tri-Cities, Washington, with the partnership of the Pacific Northwest National Laboratory, the Hanford Site Prime Contractors, and the U.S. Department of Energy (DOE).

Register today online, or call (509) 735-1000.

The two-day summit will include:

February 15, 2012
Fourth Chapter of Hanford Story Released to Public

RICHLAND, Wash. – The Department of Energy is releasing the fourth chapter of The Hanford Story today to the public.

February 8, 2012
EIS-0391: Supplement Analysis of an Environmental Impact Statement

Draft Tank Closure and Waste Management, Hanford Site, Richland, WA

January 27, 2012
DOE Gives Mission Support Alliance Top Safety Award

RICHLAND, Wash. — The Department of Energy (DOE) has awarded contractor Mission Support Alliance (MSA) Star Status in the (DOE) Voluntary Protection Program (VPP) for its mission support services.

January 23, 2012
EIS-0467: Notice of Intent to Prepare an Environmental Impact Statement and Notice of Floodplains and Wetlands Involvement

Acquisition of a Natural Gas Pipeline and Natural Gas Utility Service at the Hanford Site, Richland, WA, and Notice of Floodplains and Wetlands Involvement

January 23, 2012
DOE Considers Natural Gas Utility Service Options: Proposal Includes 30-mile Natural Gas Pipeline from Pasco to Hanford

RICHLAND, WASH. – The U.S. Department of Energy (DOE) is considering natural gas transportation and distribution requirements to support the Waste Treatment Plant (WTP) and evaporator operations at the Hanford Site in southeastern Washington State.

January 11, 2012
Cleanup of 77 Waste Sites Meets Two TPA Milestones: 1.2 million tons of soil and debris disposed of from D, H Reactor Areas

RICHLAND, WASH. – Department of Energy (DOE) contractor, Washington Closure Hanford, recently cleaned up 77 waste sites at Hanford to meet two Tri-Party Agreement (TPA) milestones before the end of 2011.

December 21, 2011
CX-007750: Categorical Exclusion Determination

Highlands Trail in the Longview-Cowlitz Number 1 Transmission Line Right-of-Way
CX(s) Applied: B4.9
Date: 12/21/2011
Location(s): Washington
Offices(s): Bonneville Power Administration